Loading…
Loading…
3,930 results • Latest
Maintenance of Hirni drain from Km. 0.000 to 25.000
Maintenance of Harnu drain from Km. 0.000 to 20.000
Silt Clearance of Majhigawa Mr from km 0.000 to 8.950 (Lot 16)
Silt Clearance of Armi Mr from km 0.000 to 8.140 (Lot 15
Cleaning of Dhundri Madhopur Drain Between Km.0.000 to Km 7.200 for Year 2026-27(Lot 06)
Silt Clearance of Korokala Mr from km 0.000 to 9.250 (Lot 25)
Cleaning of Rampura Drain Between Km.0.000 to Km 8.600 for Year 2026-27(Lot 05)
Repairing and Restoration of Damaged Road on Right Bank of Noida Main Drain in Between Km. 12.018 and Km. 12.055 in Distt. G.B. Nagar
Silt Clearance of Pipargaon Mr from km 0.000 to 16.600 (Lot 13)
Cleaning of Udaipur Drain Between Km.0.000 to Km 7.000 for Year 2026-27(Lot No 04)
Desilting of Noida Main Drain in between Km 7.350 and Km 7.765 in Distt. G.B.Nagar
Cleaning of Madhotanda Escape Between Km.0.000 to Km 3.950 for Year 2026-27(Lot 03)
Cleaning of Puranpur Drain Between Km.0.000 to Km 32.500 for Year 2026-27(Lot 02)
Desilting of Noida Main Drain in between Km 9.415 and Km 9.800 in Distt. G.B.Nagar
Cleaning of Chuka Drain Between Km.0.000 to Km 15.800 for Year 2026-27(Lot 01)
Desilting of Noida Main Drain in between Km 4.250 and Km 4.590 in Distt. G.B.Nagar
Desilting of Noida Main Drain in between Km 7.900 and Km 8.315 in Distt. G.B.Nagar
Desilting of Noida Main Drain in between Km 10.300 and Km 10.700 in Distt. G.B.Nagar
EARTH WORK FOR CONSTRUCTION OF THARESA MINOR FROM KM 4.564 TO KM 5.200.
Repairing and Restoration of Damaged Road on Right Bank of Noida Main Drain in Between Km. 11.391 and Km. 11.489 in Distt. G.B. Nagar
EARTH WORK FOR CONSTRUCTION OF THARESA MINOR FROM KM 3.856 TO KM 4.556.
Desilting of Noida Main Drain in between Km 9.000 and Km 9.390 in Distt. G.B.Nagar
EARTH WORK FOR CONSTRUCTION OF BHIMPUR MINOR FROM KM 1.276 TO KM 3.600.
CONSTRUCTION OF V.R.B AT KM 0.485 OF CHHACHERA MINOR.
CONSTRUCTION OF CHANDAUSI BRANCH (BALANCE WORK) FROM KM 44.458 TO KM 44.950.
Silt Clearance of Jagsara Mr from km 0.000 to 7.950 (Lot 14)
CONSTRUCTION OF V.R.B AT KM 3.850 OF THARESA MINOR.
CONSTRUCTION OF V.R.B AT KM 0.550 OF ESCAPE
Jungle Clearance, Silt Clearance and Scraping of Wazidpur Dy from km 0.000 to 11.860 (Lot 19)
EARTH WORK FOR CONSTRUCTION OF THARESA MINOR FROM KM 0.504 TO KM 1.356
Repairing and Restoration of Damaged Road on Right Bank of Noida Main Drain in Between Km. 11.711 and Km. 11.810 in Distt. G.B. Nagar
CONSTRUCTION OF V.R.B AT KM 1.970 OF ESCAPE.
Desilting of Noida Main Drain in between Km 4.635 and Km 4.975 in Distt. G.B.Nagar
LOT 03 CONSTRUCTION OF HEAD REGULATOR FOR THIRAULI MINOR OFF TAKING FROM LEFT BANK OF KUNDARKI DY. AT KM 6.100 MGC-II
Desilting of Noida Main Drain in between Km 3.000 and Km 3.320 in Distt. G.B.Nagar
CONSTRUCTION OF HEAD REGULATOR FOR JATPURA MINOR OFF TAKINHG FROM LEFT BANK OF KUNDARKI DY AT KM 1.940
Silt Clearance of Ant Mr from km 0.000 to 7.040 (Lot 10)
LOT 02 CONSTRUCTION OF D.R.B AT KM 2.256 OF HUSSAINPUR MINOR OF MGC-II
Desilting of Noida Main Drain in between Km 8.450 and Km 8.870 in Distt. G.B.Nagar
Silt Clearance of Rehata Mr from km 0.000 to 8.040 (Lot 11)
Repair work of the damaged part of the river training work due to floods in the past years for the protection of village Naujhala Nakatah-2 situated on the right bank of Sharda river in Pilibhit district. LOT-02
Closing Spill and Raising of L/B on River Sharda from D/S of Village Khairaniya to Railway Bridge in Tehsil Palia District Lakhimpur Kheri. LOT-01
CONSTRUCTION OF VRB AT KM 9.405 OF GOVERDHANPUR DY. IN DISTRICT SAMBHAL
CONSTRUCTION OF VRB AT KM 7.770 OF GOVERDHANPUR DY. IN DISTRICT SAMBHAL
CONSTRUCTION OF VRB AT KM 4.896 OF DINGARPUR DY. IN DISTRICT SAMBHAL
CONSTRUCTION OF VRB AT KM 0.400 OF DINGARPUR DY. IN DISTRICT SAMBHAL
CONSTRUCTION OF VRB AT KM 8.900 OF DHARAMPUR DY. IN DISTRICT SAMBHAL
CONSTRUCTION OF VRB AT KM 8.285 OF DHARAMPUR DY. IN DISTRICT SAMBHAL
Maintenance of Samdatal Drain from Km. 0.000 to 14.000 Distt. Amethi
Maintenance of Masiyawantal Drain from Km. 23.600 to 37.600 Distt. Amethi