Loading…
Loading…
523 results • Recent activity
Vertical brick lining of Devra pump canal from 0.500 km to 0.800 km including cost of all materials labour Tand P etc. as per drawing.
Vertical brick lining of Devra pump canal from 0.170 km to 0.500 km including cost of all materials labour T and P etc. as per drawing.
Construction of stone pitching by Earth work, C. C work, RCC work, R.R. Stone masonary work and 20 mm deep struck cement pointing with all cost of materials, labours and T and P etc for proper completion of work.
Erection of Superstructure and Stanchion leg of Cross Regulator at km 29.820 of Ken Main Canal, Banda
Erection of 2nd stage of Embedment parts , Shutter Assembly , Stanchion leg of Escape Regulator at km 29.800 of Ken Main Canal, Banda
Erection of Superstructure and Lifting Assembly(Rope Drum Hoist type), Central drive Unit of Escape Regulator at km 18.259 of Ken Main Canal, Banda