Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
210 results • Latest
Development Work in Eklingpura Shamshan. 2507
Shifting of 11KV Line or LT line and Transformer at University Junction to Shobaghpura Road. 2607
SITC of DG Set at STP Plant Kalyan Bhawan PS-3, Near RadaJi Circle. 2606
Construction of CC Road from Rahat Wali Ghati to Charbhuja Ji Temple at Revenue Village Dhikali. 2603
Construction of Road in Jai Shree Vihar Colony, Titardi. 2602
Providing and Supplying of Labour for Plantation and Maintenance Works at Kh No- 1123 to 1127 Tiger Hill Gram Badgaon. 2003
Hiring of Water Pumps with Operator and Tractor-Trolleys for Flood Control (2026-2027). 2316
Hiring of Various Machinery for Revenue Village Sisarma, Hawala Khurd, Hawala Kala, Badi and Miscellaneous Places in Div-IV. 2002
Operation and Maintenance Work of Sewer Line in Dagiyon Ki Pancholi Housing Scheme. 2512
Operation and Maintenance Work of Sewer Line in Satudi Magri Housing Scheme. 2511
Providing and Fixing of Ultraflex Pencile Divider at Various Places in Zone-I, Div-II. 2510
Construction of Nallah from Mangal Murti Plaza to Main Road. 2509
Patch Repair Work with High Performance Ready Mix Cement Concrete and Readymade Cold Bituminous Mixture at Various Places in Div.-II. 2508
Construction of Drainage Work at Various Places in Revanue Village Savina Kheda, Balicha, Jogi Talab. 2506
Patch Repair Work with High Performance Ready Mix Cement Concrete and Readymade Cold Bituminous Mixture at Various Places in Div-I. 2505
Construction of Road and Drain in kh.No. 821, 822mi, 824, 825mi, 853mi, 3369/825, 3370/825 Rev. Village Titardi. 2504
Construction of Road and Drain from Existing Main C.C. Road to Thakar Data Circle at Titardi. 2503
Construction and Development Work at Shamshan Land, Village Dakan Kotra (Kh.No.-54) 2502
Strengthening and Renewal of Road in Sector-9, Crystal Plaza Road to Balicha-Pratapnagar Road. 2501
Printer Cartridge Refilling/Parts, Printer Spare Parts, Computer Accessories at UDA Office. (ARC) 2315
Construction of Drainage Work in Kh. No. 437 to 440, 449 to 453 Rev. Village Titardi. 2302
Construction of Drainage Work at Various Places in Rev. Village Titardi, Savina. 2301
Construction of 30ft. Road and Drain at Kh.No. 2379 to 2392 in Revenue Village Bedla near Vaidehi Appartment. 2312
Construction of Drain in at Various Places in Ashirwad Nagar, Jyoti Nagar, Virndawan Dham New Keshav Nagar Revenue Village Sobhagpura. 2311
Construction of Drain in at Various Places in Gandhi Nagar, Shyam Vihar Amrpali Nagar Revenue Village Ayad. 2310
Construction of Drain (Missing Link) in Scheme Area Pratap Nagar Block A, B, C. 2309
Patch Repairing Work at Samta Nagar, BG Nagar and Bhikhsu Colony in Rev. Village Bedla. 2308
Repair and Construction of Drain at CPS School 60ft. Road, New Bhopalpura Vandawan Dham Revenue Village Shobhagpura. 2307
Construction of 100ft. Road from Seedling School to NH-76, Amberi. 2304
Restrenghtning of Road and Construction of Drain in Vardhman Vihar Kh.No. 1340 to 1343 at Rev. Village Ayad. 2306
Providing and Fixing Road Furniture Work like Thermoplastic Line, Cats Eyes, Cold Bitumen, Retro Reflective Board, PVC Speed Breakers Etc. in Div.- III(ARC). 2305
Providing and Laying of Water Supply Pipeline in Newly Approved Residential Scheme Udyam-Vihar Rev. Village Kaladwas,UDA 2001
P And F Highmast at Barkat Colony Park Sector-12 Savina 2004
Garden Maintenance Work of Vibhuti Park Ist and IInd Both at Down Stream of Fateh Sagar Lake, Planters at FS Pal and Planters from Neelkanth Mahadev to Fatehsagar Overflow( 2025-26) 9008
SITC of Transformer and DG Set at Nehru Garden. 1902
SITC of Transformer and DG Set at UDA Premises. 1901
Providing, Laying, Jointing, Testing And Commissioning of Sewerage System and All Ancillary Works Including 10-Years O and M for Navratan Complex Area, Bhuwana, Udaipur 0701
P and F of Mini Highmast and Shifting of Highmast at R.K Circle, Shobaghpura Circle Udaipur. 1710
P and F PCC Pole and Led Ligh with Straightening Phasewire at Fanda, Titradi. 1711
Providing and Laying of Water Supply Pipeline in Newly Approved Residential Scheme Wada Dhikli, UDA. 1712
Development Works for Inner and Outer side of Pavilion Building in Khel Gaon. 1704
Repair and Maintenance Work of UDA Quarter D-1, Moti Magri. 1709
Toilet Repair or Other Maintenance Works in UDA Jurisdiction (ARC) 1708
Construction of Road in Ratadiya Farm, Jolly Nagar, Takshila Nagar, Adityanath Nagar Gram Bedla and Bedla khurd. 1707
Repair and Maintenance of Roads in Revenue Village Sisarma, Hawala Kala, Hawala Khurd, Badi and Various Places in Div.-VI. 1706
Construction of Drain (Missing Link) at Various Places in Samta Nagar, BG Nagar Etc at Revenue Village Bedla. 1705
Patch Repair Work at Various Places (Sector - 9, 14, 12, 8, Savina, Subcity Center, Balicha Titardi) in Division-I. 1701
Construction of Footpath by Paver Block at Badgaon to Kavita Road. 0402
Providing and Fixing Work of Computer Accessories in Drawing and IT Section of UDA Office. 1007
To Strengthen the Cleaning System of Fateh Sagar Lake, the work of Labour through the Contractor.8801