Loading…
Loading…
171 results • Latest
Providing and Laying of Water Supply Pipeline in Newly Approved Residential Scheme Udyam-Vihar Rev. Village Kaladwas,UDA 2001
P And F Highmast at Barkat Colony Park Sector-12 Savina 2004
Garden Maintenance Work of Vibhuti Park Ist and IInd Both at Down Stream of Fateh Sagar Lake, Planters at FS Pal and Planters from Neelkanth Mahadev to Fatehsagar Overflow( 2025-26) 9008
SITC of Transformer and DG Set at Nehru Garden. 1902
SITC of Transformer and DG Set at UDA Premises. 1901
Providing, Laying, Jointing, Testing And Commissioning of Sewerage System and All Ancillary Works Including 10-Years O and M for Navratan Complex Area, Bhuwana, Udaipur 0701
P and F of Mini Highmast and Shifting of Highmast at R.K Circle, Shobaghpura Circle Udaipur. 1710
P and F PCC Pole and Led Ligh with Straightening Phasewire at Fanda, Titradi. 1711
Providing and Laying of Water Supply Pipeline in Newly Approved Residential Scheme Wada Dhikli, UDA. 1712
Development Works for Inner and Outer side of Pavilion Building in Khel Gaon. 1704
Repair and Maintenance Work of UDA Quarter D-1, Moti Magri. 1709
Toilet Repair or Other Maintenance Works in UDA Jurisdiction (ARC) 1708
Construction of Road in Ratadiya Farm, Jolly Nagar, Takshila Nagar, Adityanath Nagar Gram Bedla and Bedla khurd. 1707
Repair and Maintenance of Roads in Revenue Village Sisarma, Hawala Kala, Hawala Khurd, Badi and Various Places in Div.-VI. 1706
Construction of Drain (Missing Link) at Various Places in Samta Nagar, BG Nagar Etc at Revenue Village Bedla. 1705
Patch Repair Work at Various Places (Sector - 9, 14, 12, 8, Savina, Subcity Center, Balicha Titardi) in Division-I. 1701
Construction of Footpath by Paver Block at Badgaon to Kavita Road. 0402
Providing and Fixing Work of Computer Accessories in Drawing and IT Section of UDA Office. 1007
To Strengthen the Cleaning System of Fateh Sagar Lake, the work of Labour through the Contractor.8801
Construction of Service Road from Kali Magri to RTO Junction on 200ft. Road from Sukher to RTO. 0601
Construction of CC Road at Bedla Badgon 40ft. Link Road.1004
Construction of Roads and Plot Leveling Work in the Newly Approved Farm House Scheme Area in Revenue Village Nohra of UDA.1005
Hiring of JCB and Tractor with 5 Labour in Div.-III. (ARC) 1101
Construction and Repairing of Drain at HUDCO Quarter in Meera Nagar near DPS School. 1103
Construction of Clay Tennis Courts (2 Nos.) at Maharana Pratap Khel Gaon, Udaipur. 1102
P and F Straighting Phase Wire and Led Light at UDA Area. 1006
Construction of Road in Jai Shree Vihar Colony, Titardi. 1002
Construction of Road and Drain Work at Aaraji No. 654, 660, 663, 2669.1153/659 to 931MI Rev. Village Dewali Goverdhan Vilas. 1001
Restrengthening of 60ft Master Plan Road Kh.No. 235, 236 to 240, 300 to 309 Garib Nawaz Choraha to Asirwad Nagar Chorha Roopsagar Road Revenue Village Ayad. 1003
Construction of Road from Shisham Ki Ghati (Rebari Basti) to Bichadi at Revenue Village Tulsidas Ki Saray. 9102
Development Work of Lakhawali Talab Feeder Canal. 0401
Repair Work at Satudi Magri, Bedwas EWS G Plus 3 Quarters. 0901
Consultancy Work for Preparation of Detailed Project Report for the Development of 200ft. Road from Bhuwana Choraha to Amberi Puliya also with Junction Development of Amberi Puliya.(0102)
Consultancy Work for Preparation of Detailed Project Report for the Development of Amberi 100ft. Road Junction with NH-08 near Chirwa Tunnel and Mega Awas Yojna 100ft. Road Juntion with NH-76. (0101)
Construction of Drains at Various Places in Meera Nagar Scheme Area and Other Converted Area in Bhuwana, Shobhagpura and Navratan Complex. 0903
Covering of Nallah at 80ft. Road in Chitrakoot Nagar Scheme Opp. Meera Medpat Bhawan. 0906
Development of Garden (Ganga Park) in Chitrakoot Nagar, Bhuwana Vistar Yojna. 0905
Development Work in Central Park in Navratan Complex. 0904
Preparation of a DPR for the Land-Scaping of Hilly Terrains and Other Areas along Rani Road, along with Systematic Planning and Beautification of various Tiraha and Chouraha, as well as the Overall Development and Beautifica
Repair and Maintenance Electric Work of Street Light in UDA Zone-III Area. (ARC) 8703
Providing and Fixing of LED Light and Straightening Phase Wire at Maryada Nagar Society Meera Nagar. 0809
Repair and Maintenance Work of Street Light, Electrical Maintance Work at Khelgeon. (ARC) 0808
SITC of Transformer and DG Set at Nehru Garden. 0807
Patch Repair Work at Various Places (Sector - 9, 14, 12, 8, Savina, Subcity Center, Balicha Titardi) in Division-I. 0801
Development of Tube Well Facility along with Submersible Pump in Park for Trees Lawn and Plantation in Shyam Vihar Park near RTO Office Revenue Village Ayad. 0806
Providing and Fixing of Children Equipment and Development of Play Ground at Government Primary School Panchwati Syhon Colony, Udaipur. 0805
Practice Wall and Other Development Works for Lacrosse Court in Khel Gaon. 0804
Construction of Boundary Wall at Chitrakoot Nagar Kabristan near Old Slurry Dumping Yard. 0803
Development of Garden in Chitrakoot Nagar Samudayik Bhawan. 0802
Construction of Median/Planter at Various Main Roads in South Extension Scheme. 9101