Loading…
Loading…
6,433 results • Latest
Mhaisal Lift Irrigation Scheme - Maintenance work of PDN leakage, Sluice valve etc. on Extended Gavhan Lift Irrigation Scheme
Mhaisal Lift Irrigation Scheme - Repair work of sluice valves and air valves on old PSC pipelines and rising main, PSC pipeline leakage removal and other related works on Banewadi LIS
Mhaisal Lift Irrigation Scheme - Construction of Valve Chember For Direct Outlet K.M. no. 16 and K.M. No.25 of Salgare Branch Canal km 11 to 30
Conversion of open canal into closed pipe canal of minor 3 on distributory no 32 of URBC With Ancillary Work
Repairs work for Canal structure and embankment of Slab Drain at Ch. 7/045 of Bedag main canal Km 1 to 9
Construction Of Bridges At RD 7800m And 8400m Respectively And Drain Crossing, Catch Water Drain In Affected Areas Of Chikhlapar Sub Branch Canal Of Mokabadi Lift Irrigation Scheme.
Preparation of Detailed Project Report for repair and maintenance of 10.00 numbers of aqueducts situated at different chainages (Total length length 1165.50 meter) in Tenu Bokaro Canal. under Tenughat dam division, Tenughat
Construction of retaining wall to nallah near the house of Dr. Shirish Borkar at Deulwada in V.P. Borim of Shiroda Constituency
CONSTRUCTION OF ENERGY DISSIPATION ARRANGEMENT OVER WASTE WEIR FOR PANGARDARWADI STORAGE TANK UNDER KMIP LIS 2 STAGE-3
Construction of WBM Road at Sukkarwada Distributary RD 0.00 M to 700.00 M.