2,700 results • Recent activity
INSTALLATION OF 700 MM DIA. BFV AT THE DELIVERY SIDE OF PUMP NO-1 ADJACENT TO THE 1500 MM DIA. MANIFOLD OF CWPS1 BY REPLACING THE EXISTING 700 MM SV INCLUDING STRENGTH. OF THE LEAKY PORTION OF THE MANIFOLD AND REPL.OF MANHOLE GASKETS UNDER GRWW
NEUTRALIZATION AND WASHING OF OLD LIQUID CHLORINE TONNERS AND SHIFTING OF THE TONNERS TO A SUITABLE LOCATION AT WTP-I UNDER GRWW.
ELECTRO-MECHANICAL FAULT DETECTION AND RESTORATION WORK AT G S BOSE ROAD CBPS AND HEAD WORKS
SUPPLY, DELEVERY AND INSTALLATION OF 2 NOS.20 HP NEW SUBMERSIBLE PUMP-MOTOR SET WITH ALLIED WORKS AT SENHATI SACHINDRA NATH PARK CAPSULE BPS.
OPERATION OF PLANT AT PRAMATHA NATH BISHI (BANGURPARK) CAPSULE BOOSTER PUMPING STATION FOR THREE YEARS
MAINTENANCE OF WET SUMP PORTION OF SLUDGE WATER LIFTING STATION UNDER GRWW ON REGULAR BASIS.