Loading…
Loading…
4,554 results • Latest
Construction and Maintenance of Road from L081-(Link Road) Mota Draman (Marta to Lakhod) Package No. JK14-4209 PMGSY-IV, Batch-I of 2026-27, Block-Ramnagar, District Udhampur. (Using Waste Plastics Length-6.725 Kms) Length 6.725 Kms
L062 Bhandari Gaon Maundari Paryan Motor Road Stage I and II
Construction and Maintenance of Road from L154-(Link road) Budhan Gref Road to Hiramangh Package No. JK20-4245, PMGSY-IV, Batch-I of 2026-27, Block-Thuroo, District Reasi. (Using Waste Plastics 4.200 Kms) Length 4.200 Kms
Package NO. ADB (II) SAT-BR-02 Tal. Man, Dist. Satara Total 06 Bridge Work
Package NO. ADB (II) SAT-BR-06 Tal. Phaltan, Dist. Satara Total 03 Bridge Work
Package NO. ADB (II) SAT-BR-04 Tal. Khatav, Dist. Satara Total 10 Bridge Work
UT08451-2 CONSTRUCTION OF Dharmpur to Dabar Motor Road of 2.000 KM WITH FIVE YEARS MAINTENANCE WORK UNDER PMGSY
Construction and Maintenance of Road L024-(Link Road) From Km 6th of Road Dasanu Choie To Porth Salada Package No. JK07-4025, PMGSY-IV, Batch-I of 2026-27, Block-Barnoti, District Kathua (Using Waste Plastics Length 12.425 Kms) Length 12.425 Kms
UT114692 L032-Lachhmoli Hisriyakhal MR to Daduwa Sirola MR Stage-I and II
Construction and Maintenance of Road L040-(Link Road)KM 8th Beeru Basti to Dugli road to Gulla top Package No. JK04-4053, PMGSY-IV, Batch-I of 2026-27, Block-Bhalla, District Doda (Using Gbion Wall Length-9.320 Kms) Length 9.320 Kms