Loading…
Loading…
1,245 results • Latest
Carrying out Final Location Survey, Geotechnical studies, preparation of drawings, preparation of detailed Project Report (DPR) and EPC tender document and other preliminary activities for preparing detailed estimate on actual realistic cost of rehabilitation/modification of existing Delhi-Mumbai Railway Line & proposed 3rd & 4th Line works affected from submergence of the proposed Doongri Dam under Modified PKC ILR Project as Deposit Work (27.50 Kms.).
Design/Modification, Supply, Erection, Testing and Commissioning of 132kV/55 kV Scott connected Traction Sub Station and switching posts with AT between feeding Itarsi (Excl.) - Shridham (Incl.) section (without SCADA) of Jabalpur Division, W C Railway in connection with Up-gradation of Electric Traction System from 1x25 kV to 2x25 kV Traction System of WCR to meet 3000 MT loading target.
Salmeterol 50 mcg & Fluticasone Propionate 250 mcg
Levosalbutamol 50 mcg + Beclomethasone 50 mcg. Inhaler 200 MDI with Dosage counter
Telmisartan 40 mg + Chlorthalidone 12.5 mg tab
Part-A: - Assistant Divisional Engineer (North) Satna: - Provision of drainage and height gauge for LHS 388. Part-B: - Assistant Divisional Engineer (South) Satna: - Provision of drainage and height gauge for LHS 358. Part-C: - Assistant Divisional Engineer (South) Satna: - Provision of drainage and height gauge for LHS 370. Part-D: - Assistant Divisional Engineer (South) Satna: - Provision of drainage and height gauge for LHS 372.