Loading…
Loading…
6,394 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - BSNL ED BG NIT NO27 Providing New LT power supply to the existing TE at Chikkaballapur Kolar OA including Contract Demand reduction and conversion from HT to LT supply; ..
Custom Bid for Services - 9070C26C24 Agency for special piping job in AVU, SWSU, TGTU, Alkylation & VGO during M&I Shutdown at Paradip Refinery of IOCL Similar Category Support Services Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PAINTING OF VARIOUS OUT-DOOR/IN-DOOR EQUIPMENTS INCLUDING SUPPORT STRUCTURES ETC AT VARIOUS 220KV SUB-STATIONS UNDER EAST CIRCLE (EAST-1 & EAST-2); AS PER NIT AND DTL ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Thermal Power Station sikka; Work of servicing and overhauling of C&S make LT ACBs installed at STPS on as and when required basis & during AOH/COH; As per ATC
REPAIR AND MAINTENANCE OF VRF AC VARIOUS CONTACTOR FOR COMPRESSORS AND AHU MOTORS AND FILTERS OF AHUS AND CONNECTED WORKS AT STORE CHESS, DESIGN AND TESTING CENTER SINT M CPC CPDC AND GOVARDHAN AT ELSEC UNDER GE I RND RCI HYDERABAD
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PROVIDING AND FIXING 4 SETS OF OPEN GYM EQUIPMENT AS PER ANNEXURE A AT VARIOUS LOCATIONS WITHIN RATLAM DISTRICT; 4 SETS OF OPEN GYM EQUIPMENT AS PER ANNEXURE A; Service ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - CRN 4671NDT Material Mix up analysis DPTMPI and Thickness testing) OF Boiler AREA PIPING FOR Unit 1 2 and 3 FOR IGSTPP APCPL, Jharli)FOR OVERHAULING FOR TWO YEARS; As ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PROVIDING AND FIXING 13 SETS OF OPEN GYM EQUIPMENT AS PER ANNEXURE A AT VARIOUS LOCATIONS WITHIN SIDHI DISTRICT; 13 SETS OF OPEN GYM EQUIPMENT AS PER ANNEXURE A; Service..
Providing and Installation of RO Plant with Borewell and Repair of the Existing RO Plants With Maintenance work at Various wards of 01,10,15,20,21,28,29,30,32,33, 36 & 40 in Kalaburagi City (Est Cost Rs. 122.89 Lakhs) (Category-Others) (15th FC NMPC 2023 and 2024)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; The Work of Complete Servicing and overhauling of Regenerative Air Pre heater in Boilers of Unit 3, 4 and 5 at GTPS During AOH COH of Unit; Service ..