Loading…
Loading…
6,394 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Work of Overhauling of Unit 3 4 Bottom Ash System Clinker Crusher Jet Pumps Feed Gates Valves etc during AOH COH Short shutdown FSD and As and ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5183G Miscellaneous C&I related pneumatic cylinder works to be carried out as and when required for Unit #6, Ukai TPS; WT-5183G Miscellaneous C&I related pneumatic cyl..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5206GRate contract for removing lifting shifting dismantling and overhauling of 6600 V HT motors FD Fan Coal Mill DMCW CEP AIR COMP of Unit No 6 Ukai TPS during runni..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - As per NIT; Attending of Wiring Faults in Equipments/Control/Metering/Protection panel wiring at various 220KV Sub-Stations Under AGM(T) O&M East-1 circle for One year;..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Thermal Power Station Sikka; Work of On line PD testing of 245KV 1200 sq mm and 300 sq mm XLPE cable termination bushing with required testing equipment at Sikka TPS; Se..
Annual Rate contract for Erection and Maintenance work of HT/LT Line and TC Structure and Laying, Testing & Commissioning of 11/22KV underground XLPE cable with cable end termination & straight though jointing kits Work of Arti Drug SR No 12849979 under ND Scheme Atali Sub Division under Bharuch Rural Division
Annual Rate contract for Erection and Maintenance work of HT/LT Line and TC Structure and Laying, Testing & Commissioning of 11/22KV underground XLPE cable with cable end termination & straight though jointing kits Work of SR No 12764390 under ND Scheme under Atali Sub Division Only under Bharuch Rural Division
Annual Maintenance of Road from Nagarakatte (on SH65) connecting Harappanahalli Taluk Border via Kadajii, Alur Link Road from Kadajji connecting Harappanahalli taluk border Major District road from Ch 0.00 to 9.73 and Ch 0.00 to 1.90 Km in Davanagere taluk for the year of 2026-27. (RESERVED FOR SC CATEGORY)
Annual Maintenance of Road Connecting from Shettikere to Kamalapura via Madihalli,Bharanapura,Daggenhalli, Hosuru from Ch. 0.00 to 5.95 Km and Ch. 7.45 to13.04 Km for the year 2026-27 in Chikkanayakanahalli taluk Tumkur District.(Over Lap 0.16 Km)(Total Length of road from Ch 0.00 Km to 17.30 Km )
Ordinary repair and maintenance as well as new work additions and alternations to existing structures and emergent works in the service buildings at FZR-TWB section (Zone No-3) in the section of SSE/W/FZR under ADEN-I/FZR (2026-27).