Loading…
Loading…
40,077 results • Best match
Repairing and preventive maintenance work of Toilets/Bathrooms darinage system including providing and fixing water closet, wash basins etc. and all allied works at Head Office building of MP Jal Nigam Maryadit, Bhopal
Repairing and preventive maintenance work
ANNUAL REPAIR AND SPECIAL REPAIR TO RESIDENTIAL BUILDING TYPE VI UNDER MAINTENANCE BOOTH SECTOR-16, CHANDIGARH.
eProcurement System Chandigarh UT Administration Created By: AMIT KUMAR GUPTA Created Date/Time: 27-May-2026 06:31 PM Tender Title: ANNUAL REPAIR AND SPECIAL REPAIR TO RESIDENTIAL BUILDING TYPE VI UNDER MAINTENANCE BOOTH SECTOR-16, CHANDIGARH. Tender ID: 2026_CHD_92510_1
ANNUAL REPAIR AND SPECIAL REPAIR TO RESIDENTIAL BUILDING TYPE V UNDER MAINTENANCE BOOTH SECTOR-16, CHANDIGARH.
eProcurement System Chandigarh UT Administration Created By: AMIT KUMAR GUPTA Created Date/Time: 26-May-2026 05:45 PM Tender Title: ANNUAL REPAIR AND SPECIAL REPAIR TO RESIDENTIAL BUILDING TYPE V UNDER MAINTENANCE BOOTH SECTOR-16, CHANDIGARH. Tender ID: 2026_CHD_92508_1
ANNUAL MAINTENANCE (STAGE) BY WAY OF DAY TO DAY REPAIR DEMANDS AND ASSOCIATED MAINTENANCE WORKS (HARDWARE REPAIRS) AT SKICC FOR THE YEAR 2026-27
eProcurement System Government of Jammu And Kashmir Created By: VIMAN PANDIT Created Date/Time: 04-May-2026 04:11 PM Tender Title: ANNUAL MAINTENANCE (STAGE) BY WAY OF DAY TO DAY REPAIR DEMANDS AT SKICC Tender ID: 2026_Tourm_307971_1
Repair and preventive maintenance of pipelines under WSS Civil Lines and Shyam Nagar jurisdiction of City Sub Division-VIII (S) Civil Lines, Jaipur
Maintenance of pipelines irrespective of size and material which includes repairing of bursts and leakages pollution control, survey and removal of choking, disconnection of illegal connections, collection and recording minimum 10 nos of residual chlorine samples during supply timings, interconnections and all work related to pipeline network in existing distribution and rising main pipelines of all sizes by digging out suitable size of pit in soft and loose soil\ hard soil including cutting of black top, WBM & CC top of road of any size at work site. this will also cutting of pipe ends, fixing of pipe piece with jointing materialto make repair proof and refilling of pit by excavated sand by ramming it at side of pipes and upto ground level. For entire job contractor will use their own T&P. Contractor with his own resources shall arrange dewatering, JCB and tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. the work include daily patrolling and repair the leakage within stipulated time and complete maintenance of pipeline network of rising and distribution pipeline network within the scope of work for per Km pipe line per month. Jointing material shall be provided by the department. (129 km x12 month) Minimum labour for a following kms pipelines to be deployed 1 Km to 50 Km - 1 Fitter II and 1 Beldar 51 Km to 100 Km - 1 Fitter II and 2 Beldar 101 Km to 200 Km - 2 Fitter II and 4 Beldar 201 Km to 300 Km - 3 Fitter II and 6 Beldar 301 Km to 400 Km - 4 Fitter II and 8 Beldar
Repair and Preventive Maintenance of pipelines (leakages and Pollution control), Valve operation in Nahari ka naka under City Sub Dn-V (North), Jaipur
Maintenance of pipelines irrespective of size & material which includes Repairing of Brusts & leakages, Pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording daily minimum 10 nos. residual chlorine samples during supply timings, interconnections & all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also includes cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T&P. Contractor with his own resources shall arrange de-watering, JCB, TRACTOR COMPRESSOR if reqired and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work FOR PER KM LINE PER MONTH 1. (101km to 200Km (NKN Chowki) 112 Km.