Loading…
Loading…
40,077 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Annual maintenance of special protection scheme installed at 400kV Substation, Kasara-Mau; Substation; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Annual maintenance of special protection scheme installed at 400kV Substation
REPAIRS AND MAINTENANCE INCLUDING ROUTINE PREVENTIVE MAINTENANCE OF SEWAGE PUMPING SETS, MOTOR, STARTERS AND ALLIED WORKS AT VARIOUS SEWAGE INSTALLATIONS INCLUDING CLEANING AND REPAIR OF UG SUMPS AT VARIOUS SEWAGE INSTALLATIONS AT AFA HYDERABAD
M&L for disconnecting the suction and delivery pipe lines and electric connections for Non-clog Diesel Engine Pump Sets of Sewage Installations of 10 HP capacity, servicing it throughly by carrying out repairs such as replacing wornout bearings, shaft/ bushes, nuts, bolts, washer, greasing and bringing it to a perfectly workable condition and connecting up of suction and Delivery pipelines incl testing complete all as specified and as directed & to the entire satisfaction of the Engr-In-Charge. Note: The unit rate quotred against the item includes cleaning / repairs / replacement of minor items such as nuts, bolts, gland rope, packing materials etc, removing from its original position carefully and transporting the same to work shop, dismantling / opening the engine for inspection, repair / replacement of worn out parts with new one incl cleaning, lubricating, replacing the minor items like studs, nuts, bolts, washers etc. reassembling the Diesel Engine Pump Set including painting with two coats of synthetic enamel paint, transporting back and refixing the same in its original position incl all necessary connections, testing and commissioning complete all as specified and as directed.
REPAIRS AND MAINTENANCE INCLUDING ROUTINE PREVENTIVE MAINTENANCE OF SEWAGE PUMPING SETS, MOTOR, STARTERS AND ALLIED WORKS AT VARIOUS SEWAGE INSTALLATIONS INCLUDING CLEANING AND REPAIR OF UG SUMPS AT VARIOUS SEWAGE INSTALLATIONS AT AFA HYDERABAD
M&L for disconnecting the suction and delivery pipe lines and electric connections for Non-clog Diesel Engine Pump Sets of Sewage Installations of 10 HP capacity, servicing it throughly by carrying out repairs such as replacing wornout bearings, shaft/ bushes, nuts, bolts, washer, greasing and bringing it to a perfectly workable condition and connecting up of suction and Delivery pipelines incl testing complete all as specified and as directed & to the entire satisfaction of the Engr-In-Charge. Note: The unit rate quotred against the item includes cleaning / repairs / replacement of minor items such as nuts, bolts, gland rope, packing materials etc, removing from its original position carefully and transporting the same to work shop, dismantling / opening the engine for inspection, repair / replacement of worn out parts with new one incl cleaning, lubricating, replacing the minor items like studs, nuts, bolts, washers etc. reassembling the Diesel Engine Pump Set including painting with two coats of synthetic enamel paint, transporting back and refixing the same in its original position incl all necessary connections, testing and commissioning complete all as specified and as directed.
Annual repair and maintenance of Badli water /sewer store in Badli Constituency AC-05 under EE(C)-11.
Annual repair and maintenance of Badli water /sewer store in Badli Constituency AC-05 under EE(C)-11.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transmission Line; Comprehensive Preventive and Break Down Maintenance Patrolling etc of Various 400 KV 220 KV and 132 KV Line; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Transmission Line; Comprehensive Preventive and Break Down Maintenance Patrolling etc of Various 400 KV 220 KV and 132 KV Line; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transmission Line; Comprehensive Preventive and Break Down Maintenance Patrolling etc of Various 400 KV 220 KV and 132 KV Line; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Transmission Line; Comprehensive Preventive and Break Down Maintenance Patrolling etc of Various 400 KV 220 KV and 132 KV Line; Service Provider