Removal of slips, Surface Dressing and Unlined surface Drain at various road at various Rds.
Construction of unlined surface drains of average cross-sectional area 0.40 sqm (Zero point foruty) in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m (Three meter) and lead of 50 m(fifty meter) (average lead 25 m) (Twenty five meter) as per Technical Specification Clause 307 as per including carriage of material within all leads and lifts and other incidentals The rates are inclusive of octroi, royality, malkana ,toll tax, GST or other taxes imposed by the Government
Removal of slips, Surface Dressing and Unlined surface Drain at various road at various Rds.
Construction of unlined surface drains of average cross-sectional area 0.40 sqm (Zero point foruty) in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m (Three meter) and lead of 50 m(fifty meter) (average lead 25 m) (Twenty five meter) as per Technical Specification Clause 307 as per including carriage of material within all leads and lifts and other incidentals The rates are inclusive of octroi, royality, malkana ,toll tax, GST or other taxes imposed by the Government
Balance Works for Resurfacing / Repairing of Bituminous and Concrete Roads and Drains at Foundry Forge Division HAL BC
REPAIR TO ROAD SURFACE, ROAD BERMS AND ROAD FURNITURE AT NABHA UNDER GE (S) PATIALA
NOTES : (i). The contractor shall quotes the rate against Item considering 5.5% VG-30 bitumen content. Job Mix Formula as per CIause. No. 505.3.3 of MORTH (5th Rev) for BC shall be worked out from Thapar Insti. of Engg & Tech. Patiala/ NIT Kurukshetra/ PEC Changigarh/ CTL for obtaining Optimum Binder Content (OBC) by the Contractor without any financial effect to the Dept and same be submitted to the accepting officer for approval. Any variation in binder content on minus side shall be adjusted @ Rs 50/kg of binder and no adjustment shall be made on plus side. (ii). Cost of filler i.e. cement (Ordinary portland cement/OPC) is deemed to be included in quoted unit rate. (iii). After spreading of mix as per clause 507.4.7 entire surface during the operation shall be rolled with road roller 8-10 tonne (smooth wheeled) followed with vibratory road roller of 8-10 tonne static weight, followed by finished rolling with 6 to 8 tonne smooth wheel tendom roller as per Clause Nos. 507.4.8 and cost of the same is deemed to be included in quoted unit rate. (iv). The vintage of the T&P (Hot mix plant/road roller i.e. vidrating roller,static roller,hydraulic roller/paver) to be incorporated in the wk should not be more than 10 years except the tippers and shall be approved by GE before date of commencement of the work. (v). The certificate wrt the capactiy of the hot mix plant (HMP) shall be 100-120 TPH and the plant shall be electronic operated, batch type and location be intimlated and the same shall be approved by GE before date of commencement of the work.
Road surface improvement work in Ashiana area of district Lucknow
Providing and applying primer coat with SS-2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
Work of Constructing, Widening, Strengthening and Resurfacing of Various important roads as and when required or in emergency under R & B Panchayat Sub Division Kalawad Tal.: Kalawad Dist.: Jamnagar (Annual basis) (3rd Try)
23 Providing and laying asphalt painting on B.T. 15000.00 Sqm. 36.36