Loading…
Loading…
24,977 results • Best match
RESURFACING WORKS ON LANGRU-PHOTOSKAR-NIRAQ ROAD IN BETWEEN KM 0.000 TO KM 10.000 UNDER 114 RCC 13 BRTF UNDER PROJECT YOJAK IN LADAKH (UT) (2nd Call)
RESURFACING WORKS BETWEEN BETWEEN KM 0.00 TO KM 10.00 ON NPD ROAD (ALTITUDE - 3001 to 3300 Mtr)
RESURFACING WORKS ON NIMMU-PADAM-DARCHA ROAD IN BETWEEN KM 124.700 TO KM 134.700 UNDER 126 RCC 13 BRTF UNDER PROJECT YOJAK IN LADAKH (UT) (2nd Call)
RESURFACING WORKS BETWEEN BETWEEN KM 124.700 TO KM 134.700 ON NPD ROAD (ALTITUDE - 3301 to 3600 Mtr)
RESURFACING WORKS ON NIMMU-PADAM-DARCHA ROAD IN BETWEEN KM 18.000 TO KM 35.000 UNDER 114 RCC 13 BRTF UNDER PROJECT YOJAK IN LADAKH (UT) (2nd Call)
RESURFACING WORKS BETWEEN BETWEEN KM 18.000 TO KM 35.000 ON NPD ROAD (ALTITUDE - 3301 to 3600 Mtr)
Engagement of Third Party Inspection or Quality Assurance Agency for i. Thorough upgradation and resurfacing of Taratala Road and ii. Yard development for Cargo, container storage space at KPD of KDS , SMPA.
Thorough upgradation and resurfacing of Taratala Road (old & new) including reconstruction and repairing of drains alongwith miscellaneous works
MAINTENANCE OF DAMAGED ROAD BY BITUMINUS SURFACING TO PREVENT ROAD DUST NEAR PREM. NO- A /12,A/121, A/87 ETC. SAMMILANI PARK AND SORRUNDING AREA IN W -109, BR-XII, KMC.
Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture)a) without paver finisheri) Day Time ( Ref :As per KMC Rates, taxes, fees & Charges for the year 2019-2020, As per present market Price, Rate appvd. By D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar no-02 of 2018-19 dtd.04.04.2018 )
MAINTENANCE OF DAMAGED ROAD BY BITUMINUS SURFACING TO PREVENT ROAD DUST NEAR PREM. NO- A/112, A/121, A/137 ETC. SURVEY PARK AND SORRUNDING AREA IN W -109, BR-XII, KMC.
Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Day Time ( Ref :As per KMC Rates, taxes, fees & Charges for the year 2019-2020, As per present market Price, Rate appvd. By D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar no-02 of 2018-19 dtd.04.04.2018 )