Loading…
Loading…
72 results • Best match
Design Engineering Supply Installation and Commissioning of Integrated Renewable and Battery Energy Storage System BESS of 8MW Wind Farm 5 MWh BESS at VOCPA
Design, Engineering, Supply, Installation and Commissioning of an 8 MW Wind Farm at VOCPA Port Estate, Tuticorin, including Civil, Electrical and Communication Works, Power Evacuation System, Grid Connectivity in compliance with DISCOM (TANGEDCO) norms, along with a 2-year warranty and free Operation & Maintenance (O&M) period, Design, Engineering, Supply, Installation, Testing and Commissioning of a 5 MWh Battery Energy Storage System (BESS), including integration with the Renewable Energy infrastructure and grid system, in compliance with applicable DISCOM norms, along with a 2-year comprehensive warranty and free Operation & Maintenance (O&M) period.Integration of all Renewable Energy projects with the Port’s power and grid systems, and development of a centralized real-time monitoring and analytics Dashboard with a 2-year free comprehensive maintenance Period.
Cluster C Implementation of Standalone Battery Energy Storage System (BESS) of 41MW/102.5MWh capacity at Uttarkashi, Haridwar , Roorkee UPCL under Capacity Charged Based Competitive Bidding Mechanism
INSOLARE ENERGY LIMITED (BID ID -429492)
Setting up of 7MW/1.5MWH Grid Connected Solar PV Projects with Battery Energy Storage System (BESS) at Stakna Power Plant in Leh- Ladakh under RESCO Mode through Tariff Based Competitive Bidding
Cost of Energy Generated by SPD after Setting up of 7MW/1.5MWH Grid-Connected Solar PV Projects with Battery Energy Storage System (BESS) at Stakna Power Plant in Leh-Ladakh under RESCO Mode . Per unit cost for entire contract period
Cluster A Implementation of Standalone Battery Energy Storage System (BESS) of 36MW/90MWh capacity at Rudrapur , Kashipur , Haldwani ,Pithoragarh UPCL under Capacity Charged Based Competitive Bidding Mechanism
Kundan Green Energy Private Limited (BID ID -429504)
Cluster B Implementation of Standalone Battery Energy Storage System (BESS) of 23MW/57.5MWh capacity at Dehradun urban and Dehradun rural UPCL under Capacity Charged Based Competitive Bidding Mechanism
Kundan Green Energy Private Limited (BID ID -429514)
40 kW/100 kWh Battery Energy Storage System (BESS) integrated with the existing 30 kWp BIPV with integrated EV charging infrastructure (2 X 7.4 kW AC) at Bikalpa Shakti Bhavan including 5(five) years comprehensive maintenance on turnkey basis.
Design, Engineering, Supply, Installation, Testing, Commissioning of 40 kW/100 kWh Battery Energy Storage System (BESS) integrated with the existing 30 kWp Grid-Tied Building Integrated Photovoltaic (BIPV) to support power system critical operations of the building with integrated EV charging infrastructure (2 X 7.4 kW AC) at Bikalpa Shakti Bhavan including 5(five) years comprehensive maintenance on turnkey basis.