Loading…
Loading…
72 results • Best match
PROVN OF ROOFTOP SOLAR POWER PLANT AT BUILDING OF HQ 787 (I) AD BDE CAMP UNDER GE DEHU ROAD
1 Supply, Installation, testing and commissioning of Roof top Solar Power plant 50 KW capacity with hybrid system including the following items detail for each job . (i) Solar PV Module Standards:- Mono Perc, 545 Wp. Each panel , Total Nos of panel 90 Nos.Specification:-IEC 61215/ IEC 61730 certified panel Make- Navitas/Waaree or equivalent. (ii) Module Mounting.Structure.Standards:-GI sections 50 x 30 chanel with purling with Aluminum combo sections and clamps alongwith other connected accessories. (iii) Solar Inverter.Standards:-Growatt/Sofar/Navitas/Waaree or equivalent inverters, IEC certified. Built in DC disconnect and AC disconnect as per Electricity board. Specification:- kW rating suited for system, with 3 phase output for 50 Kw Make- Navitas./Waaree or equivalent. (iv) Earth System specification IS 3043,standards as per IS Standard / NBC standard integrated to existing building earth strip or as suited , as per recommended manufacturer. cost of excavation and required materilas alongwith PVC pipe will be included in this job . connection ensure from DB to earthing and earthing test result should be less than 10 Ohm (v) ACDB/LT Control panel including change over MCB and MCCB as per designed . Make:-ABB / Citel / L&T. (v) DC copper cables,& AC aluminum armored cables from inverter to solar panel ACDB to main existing electric source along with all connected accessories . Make: Polycab. (vi) Remote Monitoring System.Specification:-Data logger / App based data with SIM . (vii) Zero net metering device to be installed for hybrid system. (viii) Battery Backup : lithium ion battery 48V 200Ah for excess energy storage upto 50 KWh along with connecting cable as per manufacturer design and make neccessry connection from inverter . Make Luminous /Exide /Waaree or equivalent. Note : (i) Contractor will be bounded to provide certificate of test result of solar Module, Test certicicate of materials , certificate of gurantee/ warrantee for the product from manufacture at the time of installation. (ii) If any items miss out but cumpulsry for installation cost included in quoted rate. (iii) Battery backup 8 hours with discharge of 70% of battery. 1 Each Excess(+) Full Conversion INR 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
SITC of Heat pumps system, Providing and fixing to wall ceiling and floor approved quality CPVC pipes, rubber Insulation, Providing, fixing jointing and testing heavy quality metal ball valves, brass non return valve, SITC OF CABLE, SITC OF MCB, ... Water Storage Cum ...
Hot Water Storage Cum Mixing Tanks | Brand:Suntec Energy Systems | Model:4000 LTR | HSN:84021100 | Qty:2 NOS | UnitPrice:489,700 | Amount:979,400
Purchase of Books For the College Central Library
ENERGY STORAGE SYSTEMS AND COMPONENTS ALFRED RUFER 9781041049470
Proposed Building of Community Relief Centre at Nayachar Island near Meen Bhavan in the Purba Medinipur Electrical Division. ---- SITC of Solar Power system and SITC of 05 KVA DG Sets.
Supply, installation, testing and commissioning of 150 Ah solar Battery Dry cell/Lead Acid Batteries with a suitable size Battery Tray and MS rack. The backup should be a minimum of four (04) hours of operation of the whole system for energy storage with the following major specifications --.The battery shall have a higher life expectancy. Longer cycle life, Low discharge rate & charge faster. Certification: The battery should be CPRI approved and certified to meet IS 13369:1992 standard rating. [Make: Exide/Amara Raja ]
Proposed Building of Community Relief Centre at Nayachar Island near Khejurtala in the Purba Medinipur Electrical Division. ---- SITC of Solar Power system and SITC of 05 KVA DG Sets.
Supply, installation, testing and commissioning of 150 Ah solar Battery Dry cell/Lead Acid Batteries with a suitable size Battery Tray and MS rack. The backup should be a minimum of four (04) hours of operation of the whole system for energy storage with the following major specifications --.The battery shall have a higher life expectancy. Longer cycle life, Low discharge rate & charge faster. Certification: The battery should be CPRI approved and certified to meet IS 13369:1992 standard rating. [Make: Exide/Amara Raja ]
SPL REPAIR TO UPS AGAINST BER INSTALLED AT AHRR UNDER GE E/M RR DELHI CANTT-10
Supplying, installing, testing and commissioning of UPS vender approved Lithium-ion Battery (LIB) including cabinet with minimum 17 battery modules per UPS, high-performance energy storage solution designed for 3-phase UPS systems, suitable for providing 30 minutes backup time for critical infrastructure environments, featuring a total nominal capacity of minimum 67Ah and a voltage of 517 VDC. This cabinet delivers approximately 34.6 kWh of energy, offering predictable runtime and extended battery life minimum 10 years. The cabinet includes Battery Management System (BMS) for real-time monitoring at the cell, module, and cabinet levels, ensuring enhanced safety and availability. With embedded fuse protection, and seismic compliance, the system supports installation in demanding environments. Its compact footprint and rolling casters simplify site planning and mobility, while external communication interfaces like Modbus TCP/IP and RS-485 enable seamless integration IT platforms. Certified to UL, CE, ROHS, and other global standards, the cabinet operates efficiently across a wide temperature range and up to 1000 meters altitude, making it a resilient and medical applications, complete all as specified and directed. Note : (a) The UPS and LIB should be from same OEM for better compatibility, integration and service support. (b) The battery system shall be designed with highest level of protection built into the battery system against potential safety risk i.e. over voltage and short circuit. Compatibility certificate with offered model of battery and UPS shall be submitted by the contractor before commencement of work. (c) Battery sizing calculation for backup duly approved from any govt approved college shall be submitted by the contractor before commencement of work.