Loading…
Loading…
2,178 results • Best match
Construction of Balance work of Guest House/Transit Hostel and Type IV Residence at ATS Konchhabhanwar Jhansi
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
Construction of 60 nos bore-wells for recharging aquifers in Tohana w/s division Tohana of BWS circle Fatehabad (Distt. Fatehabad)
[33.19]Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by `V` notch method or any other approved method, measuring static level and draw down etc. by step draw down method, collecting water samples and getting tested in approved laboratory, i/c disinfection of tube well, all complete, including hire and labour charges of air compressor, tools and accessories etc., all as per requirement and direction of Engineer-in-charge. [Through Rate]
Construction of Anicut, Johad, MPT, ECD and Recharge Shaft Nirman Work in MJSA 2.3 Block Thanagazi (Package No. 01)
Construction of TUBE-WELL upto 100m depth and above in all type of rocks by DTH system and over burden to accomodate casing pipe of following size in all type of soils and over burden including lowering of casing pipe but excludind cost of casing pipe as per IS 2800 (part I & II ) 1979 spwcifications . The work should be completed after obtaining sand free water . The tube well should have a throughout bore as per nominal dia of casing pipe. 250 mm dia Nominal size (minimum bore size of 250 mm )
Construction of 125 mm dia machine drilled Bore well including allied accessories in the premises of Divisional Office (Executive Engineer Civil Investigation and Design Division PDC Sopore) for drinking water purpose in District Baramulla
Drilling of 125 mm diameter tube well by air rotary drilling rig unit suitable for lowering of MS casing of 125mm diameter in suitably drilled bore hole as per specifications laid down in IS 2800 (Part-I) with up to date amendments. The job is to be done in all kinds of soils, boulder, rocks, collapsible strata, saturated soils, artisan conditions by all available mechanical attachments (ODEX/DTH/Air Rotary) and exploration of ground water by tapping sufficient aquifer zones. The job includes the cost shifting of drilling accessories, tools, bits, casing shoe, consumables like fuel, lubricants, skilled and unskilled labours and other unforeseen items. Development of tube well with backwash method with air compressor of minimum capacity 1000 CFM (300 PSI air delivery system) with suitable arrangements till well is thoroughly developed in all respects as per the site requirement.
Engaging essential service to the 205 Flats at Anna Nagar Western Extension for the period from 01.07.2026 to 31.08.2026
Maintenance of Engaging Essential Service to 205 flats (160 MIG & 45 HIG) in S.No 254/2B pt, 255 pt, 256/1B pt, 258/20 pt, 258/32 pt, 253/1 part at Anna Nagar Western Extension, Ambattur Taluk, Chennai District for the period from 01.07.2026 to 31.08.2026 by engaging the required and properly trained pump operators for lifting water from sump, well or borewell to the over head tank in each block, maintenance of pump sets, attending the repair works in water supply and sanitary line and removal of blockages in water closets, inspection chambers and gullies, attending electrical fault in wiring and electrical installations in the flats, replacing the bulb in common areas, sweeping the common areas including clearing the cowdung and clearing of vegetations, bushes and jungle clearance in and around the scheme area, desilting and cleaning the storm water drains and removal of debris away from the scheme area, maintaining the avenue trees, and garden plants and to maintain the scheme area in a neat and tidy condition, operating to lift smoothly without any complaints from the residents of the scheme and also staying in the lift itself as per time schedule indicated, etc., complete in all respect and as directed by department officers.
Providing Bore Well and HDPE Tank With Platform to Ranganathapuram 4th Cross St and samiyar Thottam and Ranganathapuram Masque Street in Ward No.50 in Zone 4 Tambaram Corporation
Conducting physical survey for identification of suitable location for borewell including the loading, unloading and transporting charges for machineries etc., complete as per standard spedifications.