Loading…
Loading…
2,174 results • Best match
D/o remaining parks and Maintenance of already developed Parks Pocket 1B sector 18 with two years maintenance Yeida WC-H
Boring of tubewell with: Supplying assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818 , including required hire and labour charges, fittings & accessories etc. all complete for all depths, as per direction of Engineer in charge.
CONSTRUCTION OF ACADEMIC BUILDING AT CIPET, BHANPURI, RAIPUR I/C. WATER SUPPLY,FIRE FIGHTING, SANITERY FITTINGS & ELECTRIFICATION WORK AT DIST. RAIPUR( VIDHANSAHBA DN. RAIPUR). (BALANCE WORK) (Deposit Work- Without Escalation and Bonus)
... fixing filter of minimum 100 litre capacity for roof top rain water harvesting through tube well consisting of two layered HDPE tank with five layers (each layers of minimum 100 mm)... platefometer of required size complete as directed by Engineer in charge. (excluding cost of tubewell and inlet and outlet pipe beyond 2 metre)
CONSTRUCTION OF NEW GOVT. COLLEGE BUILDING AT NAGPUR, DISTT-M.C.B.(WORK CODE – W31298)
... fixing filter of minimum 100 litre capacity for roof top rain water harvesting through tube well consisting of two layered HDPE tank with five layers (each layers of minimum 100 mm)... plateform of required size complete as directed by Engineer in charge. (excluding cost of tubewell and inlet and outlet pipe beyond 2 metre)
Work of Augmentation of RWSS NANOR, Gram Panchayat NANOR Panchayat Samiti Bakani of Sub division Jhalawar to provide FHTC including one year Defect Liability period under JJM in the jurisdiction of PHED Division Jhalawar District Jhalawar.
... 1979 specification. The work would be competing after obtaining sand free water. The tube well should have a through bore as per nominal dia of casing pipe. a) 200 mm dia nominal bore ...
Balance work in connection with Elimination of Level crossing by construction of LHS on DUK section under ADEN/KUN.
... expansion hold fasteners on C.C. /R.C.C./Brick masonry 8.8 surface backing including drilling necessary holes and the cost of bolt etc complete. 8.8.1 Wedge expansion type 1 8.8.1.3... counter sunk 10.27 head, comprising of 10 mm dia polyamide PA 6 grade sleeve, including drilling of hole in frame , concrete/ masonry, etc. as per direction of Engineer-in-charge. 5 ...
Building Work
10000556 Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (1200cfm/300psi) as required to suit the site condition as per the direction of ...