Loading…
Loading…
2,175 results • Best match
Operation and Maintenance of CPWS Scheme at Rangapuram & 8 other habitations in Lingapalem Mandal for the Year 2026-27, Est Cost Rs.19.00 Lakhs
... 5 to 25 MLD, 25 to 50 MLD , 50 to 100 MLD and Sources having large dia High yielding tube wells (Annexure is enclosed for the System staff.) (Population x LPCD X 243/1000) from 01.06.2026 ...
PERIODICAL CLEANING AND MAINT SERVICES TO OVERHEAD RESERVOIRS, VALVE CHAMBERS AND CONNECTED WORKS IN TECH AREA AF STN GWALIOR
... separate suitable container as prescribed by the labs from following each pump house / borewell complete all as specified and directed by Engr-in-Charge :- (a) 9 Sqn Pump House (b) ...
Construction of 5 class rooms and other works to Govt. Higher Primary School at Ballurgi village in Afzalpur Taluka Under MP Lad for the year 2025-26.
Geophysical investigation of site for sinking Borewell for supplying drinking water to Habitation either through the Handpump, MWS or PWSS by vertical sounding by adopting veener sounding by adopting ...
work no-21 Ghaziabad (1 Km Stretch for mist sprayer system with one sculpture) and Sikandarpur Chowk (Hindon Airport Road) (1 Km Stretch for mist sprayer system with one sculpture)
... electric cable & wire , suitable size base frame, etc.complete as required etc., connection, Borewell, testing & commissioning etc.completeas required. The rates must include one standby ...
Development of Koraput Culture Centre, Koraput.
Bore Construction of 2nos production wells including scientific source finding through consolidated and unconsolidated rock with down the hammer drilling rig or combination rig with PVC pipe and installation of submersible pump set with all ...
CONSTRUCTION OF PUMP CHAMBER OHSR 100000 LTR MACHINERY GI PIPE LINE RISING MAIN ETC FOR VILL TREHATI JHIKLI HARYAL AND ABADIE OF VILL BAGHAR BLOCK DHAR KALAN DISTT PATHANKOT UNDER NABARD XXXI STATE SHARE
Providing & Installing 150 mm dia delivery main (from Tube-well to duck foot bend including cost of C.I.D/F Pipes, D/F Sluice Valves, D/F Non Return Valve & Specials as C.I. Bends, Tail Piece Tees, Pressure gauge, Air Valve,,V notch haudi etc. inside the Pump chamber as per DWSS standard design and analysis complete in all respects. (Annexure-3) As per IS1536-2001 & 1538-1993 reaffirmed 1999.