Loading…
Loading…
2,175 results • Best match
REDEVELOPMENT OF PECHARDAHAR WATERBODY
Washing and development of tube well by using hand pump or by any suitable method and testing of the well as per pecification and direction of the Engineer in charge
Carrying out Zone works for period ending 30.06.2027 in Zone No-19 from MSN (inclu.) to MRT up to L-Xing no. 357(inclu.).
Shrouding of tubewell bore by pea gravel of cum Lalkuan size 1.5 mm to 4.7 mm including supply of pea gravel. Total 44117.50
Carrying out Zone work for period ending 30.06.2027 on Zone No-20 from L-xing no.357(Ex.) to MTJ (Ex.) including RE colony and Delhi lajpatnager officers rest house.
Shrouding of tubewell bore by pea gravel of cum Lalkuan size 1.5 mm to 4.7 mm including supply of pea gravel. Total 44117.50
Landscaping of Park Pocket B sector 20 with two year maintenance yea. WC-H
Boring of tubewell with: Supplying assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818 , including required hire and labour charges, fittings & accessories etc. all complete for all depths, as per direction of Engineer in charge.
AUGMENTATION WATER SUPPLY SCHEME FOR VILLAGE DIWALI BLOCK JALANDHAR EAST OF DISTRICT JALANDHAR UNDER ZILA PARISHAD
Development and Stabilizing of the tubewell with air compressor of requried capacity as directed by the Engineer-in Charge including cost of tools, appliances & consumable to the satisfaction of Engineer-in Charge.
REPAIRS/MAINTENANCE OF SUBMERSIBLE PUMP SETS AND CENTRIFUGAL PUMP SETS INCLUDING PANELS, STARTER AND OTHER MISC CONNECTED ITEMS AT AF STN BHUJ
Material & labour for development of tube well by compressed air with compressor of minimum capacity of 100 PSI and 450 CFM complete all as specified and directed by Engineer-in-Charge. Note:- (i) Yield test for the bore well by continuously pumping to determine safe pumping yield to be carried out by contractor ...