Loading…
Loading…
2,177 results • Best match
Building Work
10000938 "Supplying all labour, tools and plant and materials for cleaning and developing the tubewell with compressor continuously washed till clean and adequate discharge is obtained from the tube well including supply and use of necessary equipments and labour complete in all respect as per the direction of the Engineer-in-Charge.(FOR HAND BORING WORK)Detail cost per 1 set (0-360mtr). Ground Floor
Construction of State Environment Impact and Assessment Authority (SEIAA) at plot no. IP8 Sector 5B, MDC, Panchkula Construction of State Environment Impact and Assessment Authority (SEIAA) at plot no. IP8 Sector 5B, MDC, Panchkula
TUBEWELLS Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading and sizes as per actual requirement, all complete as per direction of Engineer-in-charge. HSR 33.15
Proposed Development of Open Space in Sy.no.48/3 in Vidya Enclave in Ward no.8 at Betim, Reis Magos, Bardez-Goa.
Development of borewell using air compressor air/back washing for a period of and less than hours until all lines are flushed out and steady discharge is attend & measuring the well discharge on 90 degree V notch or with a barrels and stop watch. tube wells by uo to ...
Proposed Construction of Principal Judge (Family Court) Residence at Chaibasa (Phase-II)
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable... with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down ...
Proposed Construction of Chief Judicial Magistrate (CJM) Residence at Chaibasa (Phase-II)
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable... with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down ...
Construction work of 2 Nos F, 15 Nos G, 20 Nos H& 15 Nos I Type Residential Quarter for Officers & Employees of Civil Court Gariyaband with Approach Road, Drainage Gaurden, Cow Catcher, Overhead Tank, Boundrywall & Electrification at Dist. Gariyaband.(Gariyaband Dn.).
156 PWD PWD BLD 2015 21.17 Carrying out the resistivity survey by VES method using Schlumberger configuration for locating the proper spot for drilling of tube well within the selected habitation, including photography, interpretation of resistivity data and submission of report in the desired format along with resistivity readings, necessary graph and photographs. (only successful point is payable) Each 1502 6 0 0 N