Loading…
Loading…
2,177 results • Best match
Construction of Bridge over River Jhelum at Guzhama-Shilwat District Ganderbal.
... boom hydraulic pilling Rig all complete. 1200 mm dia piles(Truck Mounted rotary /TMR/Tube well boring machine shall not be used) incl. dewatering and pumping out of water.
Proposed G Plus 2 residential building Bhogjara Block at Basistha Kamrup M Assam
Development of tube well in accordance with IS : 2800 (part I) and IS:11189, to establish maximum rate of usable... collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories ...
REPAIR AND MAINT OF HEATING APPLIANCES AND SOLAR WATER HEATER SYSTEM AT ZONE-II OF MIL STN JAISALMER UNDER GE (A) JAISALMER
S&F tubes of Evacuated tube collector (ETC) type 1800mm long tubes with inner dia 47mm and outer dia 58mm with frame and frame angle 30 degree complete all as specified & directed by Engineer-in-charge.
TOURISM DEVELOPMENT WORK AT SAMBHOR BABA DHAM IN DISTRICT- FIROZABAD (U.P)
Supply and fixing of tube well accessories i.e. well cap, clips, clamps, etc. to complete the job in all respect.
REDEVELOPMENT OF BATASHIDHEPA WATERBODY
Washing and development of tube well by using hand pump or by any suitable method and testing of the well as per pecification and direction of the Engineer in charge
ANNUAL RATE CONTRACT FOR MAINTENANCE OF LED STRIPS WITHIN SMC LIMITS AND SUPPLY SITC OF ELECTRICAL ITEMS AS AND WHEN REQUIRED IN ELECTRIC DIVISION SMC FOR THE FY 2026-27
SITC of Single phase submersible 2 HP motor for Borewell of the fountain. Havells/crompton /Approved make