Loading…
Loading…
5,917 results • Best match
CONSTRUCTING OF COMPOUND WALL WATER TANK PREMISES AT VILLAGE WAGHADI TA SHIRPUR
COMPOUND WALL
Survey Soil investigation, Design, Supply of all materials etc. Required for construction of Over Head Tanks, CWR, SCADA room, Rising Main, Distribution Network, House connection, Boundary wall, MS gate, site development work etc.
Construction of Boundary Wall, Gate and Approach road as per type design of upjn
Construction of RCC OHR along with Land Development Approach Road Guard Room and Boundary Wall ....... in all respect of proposed Water Supply Scheme at Kulti Girls school Zone-21 Kulti under AMRUT 2.0 Phase-III within AMC
Construction of RCC Elevated Over Head Reservoir (intze type) of capacity 430 cu. m staging height 20 metre with Raft foundation including pipe connection at Kulti Area ( Zone-21 at Kulti Girls School), Guard Room, Land Development, Approach Road , Boundary wall and Sub soil investigation at premises , as per Departmental design, drawing & specification etc. along with Head works including supply of all materials as required complete in all respect of proposed Water Supply Scheme under AMRUT 2.0 (Ph-III) at Asansol Municipal Corporation.
REPAIR/REPLACEMENT OF SEWAGE LINE, FENCING GRILL, CONCERTINA COIL, REPAIR BOUNDARY WALL, GATE OF MD ACCN OF POWAI AREA AND CLEANING OF SEWAGE LINE, MAN HOLE, SEPTIC TANK, OF MD/OTM ACCN AT WORLI, MANKHURD, MALAD, PANVEL, BORIVALI, MURUD JANJIRA AREA
S& F in repairs Galvanised. 2 strand, steel barbed wire 2.24mm dia barbed with 2mm dia barbs at 75mm spacings and straining and fixing to any type of standard rails strain- ing bolts, including, securing or tying at crossings with and provision of galvanised mild steel wire, staples or steel pins, etc. as directed (each line wire to be measured)
Kadinamkulam Devaswom in Ulloor Group-Constructing compound wall at West and South side of the temple compound
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer.
Construction of Boundary wall of 2nd Tube Well Site of Gazole Zone-I Pipe Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. in the district of Malda. (2nd Call)
Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work). a) With earth obtained from excavation of fundation.