Loading…
Loading…
5,917 results • Best match
Construction of Boundary wall of 2nd Tube Well Site of Alal Zone-III Pipe Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. in the district of Malda. (2nd Call)
Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work). a) With earth obtained from excavation of fundation.
E-Tender Construction of 21680 MT capacity godowns (without roofing), E.I. work, construction of boundary wall, QC lab, manager office, labour hut, Labour toilet and construction of surrounding CC Roads at Hafed Complex Guhla Road, Cheeka (Kaithal)
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Maintenance and Repair of Road/Path by providing cement concrete tiles, Retaining walls, Parapets walls, Railings, chain link fencing etc.
Maintenance and Repair of Road/Path by providing cement concrete tiles, Retaining walls, Parapets walls, Railings, chain link fencing etc.
Construction of outfall structure an inlet structure of the Pump House at the outfall of Cantonment Khal along with construction of electrical sub-station, office building, cooling water re circulation pumping station building, boundary wall and ramp
Construction of septic tank of different capacities as per approved drawing with 1st class brick work in cement mortar (1:4) including two 560 mm dia. R.C.C. manhole cover(heavy type)of approved make supplied, fitted and fixed in the 100mm thick R.C.C (1:1.5:3) top slab with necessary fittings, 20mm thick cement plaster (4 : 1) with neat cement finish to the internal surfaces and 15 mm thick cement plaster (4 : 1) to outside wall upto 200 mm below G.L floor finished with 25 mm thick grey artificial stone over 100 mm thick R.C.C(1:1.5:3) bottom slab including supplying, fitting and fixing all necessry specials, fittings, S.W. tees, C.I. foot rest etc. including excavation earth in all sorts of soil, shoring, bailing out and pumping out water as necessary, ramming, dressing the bed and fefilling the sides of the tanks with earth, removing spoils, filling up the chamber with clear water, removing foreign materials from the chamber and including constructing attached inspection pit as per approved drawing and connecting all necessary pipes, joints etc. with internal plaster work and artificial stone flooring is to be done with admixture of water proofing compound @ 0.5% by weight of cement with all costs of labour and materials. Note:- (i) Finished level of Septic Tank should be 400 mm. from Ground Level. (ii) Height of 50 mm.Ventilation pipe &Mosquito proof mesh, should be follwed as per IS:2470,Part-I.Payment will be made separetly on the basis of actual height based on relevant I.S.Code. (i) For 20 users A) With Pakur variety. (SAIL/TATA/RINL)
Puthiyamadam Devaswom in Thiruvalla Group-Constructing compound wall-reg
Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25ltrs/10sqm over and including one coat of special primer applied @ 0.75 ltr/10 sqm.
Ummannoor Devaswom in Kottarakkara Group-Constructing compound wall -reg.
Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltre/10sqm.