Loading…
Loading…
5,917 results • Best match
Tender for Providing, Laying, Testing and Commissioning of Underground PVC sewerage Pipeline network along with Prefabricated PVC inspection Chambers for 04 Nos. Quarters of Residential Colony and Construction of Damaged Boundary Wall including Paint
15 mm cement plaster on the rough side of single or half brick wall of mix 1:6 (1 cement: 6 fine sand)
Construction of 1 No. of C-Type Qtr (Duplex) for Civil Judge (Jr Divn) cum J.M.F.C at Dampada with Approach Road, drain and Compound wall at Dampada in the District of Cuttack for the year 2024-25
Providing and fixing false ceiling (12.5mm Gypsum Board ) at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with 25mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recommended jointing compound , jointing tapes , finishing with jointing compound in 3 layers covering upto 150 mm on both sides of joint and two coats of primer suitable for board, all as per manufacturer's specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction of the Engineer in Charge but excluding the cost of painting with :Providing fitting, fixing of false ceiling with Aluminium anodized T section No-3215 with 2'-0" center to center ,L section No-1705 upto 15 micron on 4 walls to be fixed bu means of steel screw and P.V.C. plug and the Aluminium grid 2'-0" x 2'-0" with Gypsum board suspended from ceiling etc compiete . including all cost of labour, T&P, hire charges of drilling machine, labour charges etc. complete in all respects as per the direction of Engineer-in-Charge.
Construction of Boundary Wall, Watch Tower and Guard Room, Combined Building (GOs Mess, Admin Block, Store Block and SOs Mess) at BCS CRPF Andheria More New Delhi Subwork/Packages: Civil and E&M Works
BID DOCUMENT FOR CONSTRUCTION WORK OF COMPOUND WALL , TICKET ROOM, CHABUTARO, M.S GATE AND M.S RAILING AT MADLA GARDEN OF KHAMBHAT NAGARPALIKA UNDER: SWARNIM JAYANTI MUKHYAMANTRI SHAHERI VIKAS YOJANA.( UDP-88) YEAR: 2022-2023,2023-24,2024-25.
ESTIMATE FOR CONSTRUCTION WORK OF COMPOUND WALL AT MADLA GARDEN PANIYARI ROAD , AT
Permanent Restoration of Shahpura Fangota link road by way of construction of damaged Retaining walls / Protection walls
Emergent patch repair work and mainteance of existing road surface of Netaji Subhas Chandra Bose International Airport from Gate No.- 1.00 to Gate No.- 2.50 within Airport boundary wall under Barasat Highway Division I, P.W. (Roads) Dte
Providing and laying dense bituminous macadam with Hot Mix Plant producing an average output of 75 tonnes per hour using coarse aggregate, fine aggregate,filler and bituminous binder as per design Job Mix Formula conforming Marshall Method as per specification,including screening, cleaning of chips and preparing a uniform and quality mix in Hot Mix Plant and ensuring a homogeneous mix, in which all particles of the mineral aggregates are coated uniformly, transporting the hot mix to work site, laying the mixed materials at specified laying temperature with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled, vibratory and tandem rollers for break down, inter-mediate and finished rolling to achieve the desired density of at least 98% of that of Laboratory Marshall specimen, hand packing and pinning to give an even surface including cost and carriage of bitumen, coarse and fine aggregates and filler materials and hire charges of machinery and equipment for construction and quality control, fuels and lubricants and wages of operational staff complete as per Clause 505 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). B. For Grading 2 (26.5 mm nominal size, 50-75 mm thick.)