Loading…
Loading…
4,698 results • Best match
WORK NO. 03 LAKSHMI NAGAR YAMUNA BRIDGE OR KRISHNAPURI TIRAHE KE MADHYA NIRMIT 02 PULIYAO KE CHAUDIKARAN ME AANE VALE VIDHUT UPKARNO/LINE KO HATAYE JANE KA KARYA
Existing/Old & Used 25 KVA T/F Shifting from D/P to Newly Constructed D/P and reinstallation of existing T/F Safely on D/P inclunding dismantling and cartage. PROPER COMPLETION OF WORK AS PER DIRECTION OF E/In..
CONSTRUCTION OF RIVERSIDE SAVORIESI.E. BUILDING WITH UNDERGROUND ROAD BETWEEN NEHRU BRIDGE AND ELLISBRIDGE AND CONSTRUCTION OF PUBLIC PLAZA AND UNDERGROUND PARKING FACILITY AT SANSKAR KENDRA - TAGORE HALL CAMPUS CONNECTING RIVERFRONT ON WESTBANK FOR SRFDCL.
A Civil Works + plumbing Work
Construction of a Sluice Gate with vertical steel shutter near steel bridge on Battali Chandanmura road over kachi cherra under Melaghar M C of Sepahijala District
Providing structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as required.
Construction of Bridge across DRI River on Road from BRO Road to Ahungo in Anini-Mipi Block of Dibang Valley District (A.P) under VVP (Span-80.00m).
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material .. Mechanical means,Ordinary Soil.
MW:- Reconstruction of minor bridge at Km 1/4 Velugodu - Gadivmeula - Kalva - Veldurthy-Krishnagiri-P.Kotakonda - Eduladevarbanda road in Nandyal District. SW:-Conducting investigation sub-soil exploration soil testing for the work of Reconstruction ... minor bridge at ...
Improvement of hmp through road work from ravidaspuram highway to kesa via mayank chauraha ravidas puram highway and chs school to panudu river bridge Under Ward-09 Zone-5
Proving and laying Dense Graded bituminous macadam (D.G.B.M ) with 60 - 90 TPH batch type HMP producing an average output of 75 tonnes per hour crushed aggregates of specified grading premixed with bituminous binder @ 4.5 % by weight of total mix and filler tranporting the hot mix to work site laying with hydrostatic pawer finisher with sensor control to the required grade. level and alignment and rolling with smooth wheeled vibratory and tandem rollers to acheive the desired specification .