Loading…
Loading…
4,699 results • Best match
Construction of tin shed, approach road, RCC boundary wall and rooms for proposed 60 ton capacity weigh bridge for weighment of fresh waste received at SLF Okhla site.
Construction of tin shed, approach road, RCC boundary wall and rooms for proposed 60 ton capacity weigh bridge for weighment of fresh waste received at SLF Okhla site.
Construction of Road Bridge Across Bhadra River and Improvements to Connecting Road Between Donabhagatta village and Kagekodamagge ,Holehonnur Bhadravathi Main Road of Bhadravathi Taluk of Shivamogga District.(From Donabhagatta to Baballi village)
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
CONSTRUCTION OF ROAD FROM GRAM BIRWA MALAJKHAND BYPASS ROAD TO PONGAR INCLUDING BRIDGE LENGTH - 2.50 KM. TOTAL LENGHT-2.50 KM PROPOSED LENGTH -BT-2.50 KM C.C. - 00
CONSTRUCTION WORK
Construction of Pitch Road from pond of Ramesh Singh to the Khantia border bridge via Padhohi ka Poora in development block- Badraon, Gramsabha-Katihari Bujurg. (Length- 2.50 km)
Earth work in cutting /filling in ordinary Soil lift 1.50m lead upto 30 m including ramming and dressing including all as per S.I. 253
Shifting and reconstruction of 11KV and LT lines due to construction of Bridge over river Budhanadi located at Otala village on Govinda Mohanty to Chotol road Under R.W.E.S Jagatsinghpur.
Construction Earthing chamber including installation of earthing pipe making earthing chamber including excavation, soil treatment with bentonide power, calculation of earth resistance, including installation of 3Mtr. GI Pipe 40mm / 50mm including welding of GI flat around pipe.
RDD/SD/CHATRA/14/2026-27/Gr_3 Construction of High Level RCC Girder Bridge Over Partand Nala At Panchayat Kichto in Village Hosir ( Kirigarha to Hosir) in Tandwa Block of Chatra District.
CONSTRUCTION OF BRIDGE Excavation for structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) i) Ordinary Soil (Excavation upto 3.0m depth)