Loading…
Loading…
4,698 results • Best match
Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on NH -167K (Design Chainage km 87.360 to km 88.437) in the States of Telangana and Andhra Pradesh on Engineering, Procurement and Construction (EPC) Basis
CONSTRUCTION OF A BRIDGE ACROSS NALA ON HADAGALI YAMBATNAL NEGINAL MULLAL BOMMANALLI ROAD AT 10.30 KM IN BASAVAN BAGEVADI TALUK OF VIJAYAPUR DISTRICT H/A 5054-80-190-0-01-132
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20mm nominal size graded crushed coarse aggregates.
PROCUREMENT OF SINGLE GAP STRIP SEAL EXPANTION JOINT WITH LOOP ANCHOR TYPE FOR WORKS CONTRACT FOR OWG BRIDGE TO CATER MOVEMENT AND SUPERVISION OF JOB DURING INSTALLATION OF EXPANSION JOINTS AS SUB CONTRACT BASIS AT NHPC TARKHOLA SITE
Construction of High Submersible Bridge Across Kanh River From Tapobhumi to Pipliyaragho ( Panchkroshi Marg) Including Electrical Pole Shifting of HT/LT Line Xmer And Street Lighting District Ujjain
Construction of High Submersible Bridge Across Kanh River From Tapobhumi to Pipliyaragho (Panchkroshi Marg) Including Electrical Pole Shifting of HT/LT Line Xmer And Street Lighting District Ujjain.
Construction
Complete Works
Estimate for construction of approaches of Steel Bridge single span 40.54 Mtr C/C of bearing at RD 223400 of Sirhind Feeder Canal crossing from Kotli Sangar to Jhabelwali
Construction of embankment with good quality earth obtained from borrow pits including compensation of earth, loading, unloading,carriage to site of work, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per technical clause 305 of MORT&H specifications.