Loading…
Loading…
4,699 results • Best match
stimate for construction of approaches of Steel Bridge single span 73.866 Mtr C/C of bearing at RD 278896 of Rajasthan Feeder Canal crossing from Kotli Sangar to Jhabelwali
Construction of embankment with good quality earth obtained from borrow pits including compensation of earth, loading, unloading,carriage to site of work, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per technical clause 305 of MORT&H specifications.
BORING WORK FOR CONSTRUCTION OF VARIOUS BRIDGES UNDER SUB DIVISION DHAMTARI FOR 2026-27
5 Work Details :- Boring Work For Various Bridges, Under Bridge Sub - Division Dhamtari.. 1.Boring Work For Construction Of H.L. Bridge i/c Approaches Across Barpani nalla On Madwapathra - Barpani Road. 2.Boring Work For Construction Of H.L. Bridge i/c Approaches Across Bhelwakuda nalla On Gadadih - Bhelwakuda Road. 3.Boring Work For Construction Of H.L. Bridge i/c Approaches Across Kharun river On Pachpedi - Bhelwakuda - Ranitari Road in km 23/10. 4.Boring Work For Construction Of H.L. Bridge i/c Approaches Across Piperchedi nalla On Sankra Piperchhedi - Kandel Road. 5.Boring Work For Construction Of H.L. Bridge i/c Approaches Across Mahanadi On Dhamtari - Nagri road Road in km 5/4. (S.H. NO.-23) 6.Boring Work For Construction Of H.L. Bridge i/c Approaches Across Parsahi nalla On Dhuma - Darra Road. 7.Boring Work For Construction Of H.L. Bridge i/c Approaches Across Mandraud nalla on Joratarai - Mandraud Road. 8.Boring Work For Construction Of H.L. Bridge i/c Approaches Across Nagdevnalla On Rengadih - Singpur Road. 9.Boring Work For Construction Of H.L. Bridge i/c Approaches Across Mahandi On Sihawa- Borai Road in km 143/4 (S.H. NO.-23)
Construction of Wooden Bridge at Telami over Juki Khal ( Near Telami Dakhsin Su-Swashthya Kendra) in Mouza- Krishnapur, G.P- Sahara, Block-Egra-(I) P.S.-Egra Dist.- Purba Medinipur
Best Seasoned wood work in shutters, posts, plates, rafters, battens, trusses, beams, purlins, bargas, wheel-guards, running boards, frames etc. including supplying at site, handling, hoisting, fitting & fixing in position excluding the cost of bolt and nuts only but including the cost of nails and screws with cost and carriage of all materials complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels) (b) Hard Wood (Mahua / Arjun / Tentul etc or similar quality hard woodas approved by the Engineer-in-charge)
Construction Of Bridge at CH 16.14 Near Surwar on SED 10 Road From Kukunda Cross (On SH192) Connecting lahoda Cross Via Kukunda,Yadaga,Mugnoor,Surwar,Habal-t,Lahoda In Sedam Taluka Kalaburagi District
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Construction of Interlocking from the Bhira Bojhi Pitch Road Primary School to House Nebulal Sonkar via Ahada Bridge and fields of Ramjanm in development block-Badraon. (Length- 1.00 km)
Earth work in Cutting/filling in ordinary soil 30 m lead and 1.5 m lift including ramming and dressing including all as per S.I.253+231(A)
The Work of shifting the drainage line and Machine hole in front of Real Kathiyawadi Hotel at the new flyover bridge project at Sardar Estate Junction on the 40.0 meter ring road.(4th attempt)
Temporary Works are works designed, constructed, installed and removed by the Contractor which are