4,339 results • Best match
Construction of Weight Bridge Room Under Mandi Samiti Karwi.
P/F Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. DSR 5.22.1
Consultancy Services for Technical Audit and Quality Assurance and caring out the Safety audit as per IRC Morth Guideline for the work of Construction of Major Bridge on Ch. 90/200 to 90/400 Kheroj Ambaji Aburoad Road Km. 79/200 to 109/225 Ta : Danta Dist : Banaskantha (3rd Attempt)
Estimate for Construction of Bridge at RD 7485,10808,15095,19500 of UdekaranDisty
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil
Construction of R.C.C Bridge along with its Approaches at Hanarbari over Hobgar Canal
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with cement content as per IRC:15-2011, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batch mix plant / RMC and appropriate weigh batcher using approved mix design (as per IRC:44 2008), laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing, spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, polysulphide sealant, dowel bars, near approaches to bridge/ culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 for Rural Roads of MORD. M30 conc.
SPECIAL REPAIR OF BRIDGE & CULVERTS OF NO 1&2 KATGHORA SUB DIVISION UNDER DIVISION KORBA
BRIDGES
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...