Loading…
Loading…
4,423 results • Best match
Construction of Bridge in Doddamaluru -Shravandanahalli road at Ch 0.30 km (Doddamaluru) in Madhugiri taluk
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Estimate for construction of ramp on bridge at RD 37030 of Bhinder Disty
Construction of submersible bridge across mahi river on narsinghpura kheda faliya to rajod distt. Jhabua (MP)
Construction of Submersible Bridge Across Mahi River on Narsinghpur Kheda faliya to Rajod Distt. Jhabua(MP)
Installation of 4 nos speed calming measures at Habibpur block office and Aiho bridge with cautionary, informatory boards and both side embankment protection work by concrete block pitching near to Aiho bridge under GHSD under Malda Highway Division
Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). I By Mechanical Means (i) With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.)
Estimate for Construction of VR Bridge at RD 28100 of Lehragaga Link Drain
Provision of an Reinforced cement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, constructed with M-40 grade concrete , with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified-with concrete mixture. (CSR 22.12)
Estimate for Construction of VR Bridge at RD 17600 of Lehragaga Link Drain
Provision of an Reinforced cement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, constructed with M-40 grade concrete , with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified-with concrete mixture.