Loading…
Loading…
4,464 results • Best match
CONSTRUCTION OF FOOT BRIDGE FOR GUNDRE HALLA ON VAIKUNTAPURA GRAMA KUTHAGODU GRAMA PANCHAYATH SRINGERI TALUK
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Construction of a CC Road from MAH Inter College Crossing to Tulsia Bridge.
Construction of Bridge over River Bansi at Pipra Gola Ghat in District Kushinagar
Foundation Providing and Constructing Temporary Island 24 m diameter for Construction of Well Foundation for 6 m dia. Well. Assuming depth of water 1.0 m and height of island to be 1.25 m. (Reference to SR No 12.9 MORT&H Specification-A)
Construction of link road and motorable bridge at katlay koyul under District Capex
Soil testing, Design, Fabrication, Launching and Commissioning incl. weighing of drawings 20 mtrs span single lane steel plate girder Motorable Bridge with RCC decking over Koyul Nallah at Katlay, including dewatering , construction of abutments, approach of 30 mtr length (Filling and PCC walls included for a length of 30 mtr on each side of abutment), wing wall, return wall dirt wall, approach slab of 5.0mtr, RCC cap, fixing of suitable bridge bearings, expansion joints complete job, carriages of material to the site of works as per approved drawings and design with respect to site conditions duly approved by the competent authority i.e., Design Directorate (complete Job). As per direction of Engineer In- charge.
Construction of new supporting structure for existing Foot Over Bridge at GIDM, Gandhinagar.
Steel structure work,(confirming to Is 4923-1997) riveted, bolted and welded Hollow sections in builtup framed work including cutting,hoisting,fixing in position and applying a priming coat of Approved steel primer all complete as per the structural designs and direction of Enggineer-in-charge. Column & Beam (180x180x8 mm)
Estimate for Balance work for Reconstruction of fall cum- bridge at RD 7500 of Kishanpura Disty
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.