Loading…
Loading…
3,947 results • Best match
Work of dismantling, erection, supply, repair and maintenance of Kehuniya Ghat Pontoon Bridge on Khanua Nala in gram Kehuniya
Carrying of Pantoon pair from the place of anchoring (down stream side of bridge) to the alignment of bridge in water and fixing the same with other Pantoon pair and refixing the same in bridge alignment.
Improvements to Alamel Tank (Balance work) and Construction of Foot Bridge in Alamel Taluk of Vijayapur District.
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
GENERAL-Kizhakkumbhagam - SN Puram bridge -Construction of Kizhakkumbhagam - SN Puram Bridge and Approach Roads Connecting Pinarayi and Eranholi Grama Panchayaths in Kannur District.- Providing streetlights Lighting-General Electrical Work
14.7:Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) in foundation of pump, DG set etc including form work etc as required.
Interlocking construction work from Nauzheel Road near Yamuna Bridge in Shergarh towards Prajapati Mohalla Bageecha
Providingandlayingcementconcretein1:6:12(1cement : 6Coarsesand:12gradedstoneaggregate40mmnominal size) includingsupplyofallmaterials, labourandT&Petc. required for completion of work and curing complete, including cost of form work. In Foundation and floors. SI-1 CH-5 PWD SOR Mainpuri
Zonal Work of Maintenance, B.T. Patch repair of roads in P.W.D. Division No. 1, Narmadapuram. (For F.Y. 2026-27). 1st Call, PAC Rs. 80.00 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 365 days i/c rainy season.
Zonal Work of Maintenance & B.T. Patch repair of roads in P.W.D. Division No. 1, Narmadapuram. [For F.Y. 2026-27]. 1st Call, PAC Rs. 80.00 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 365 days i/c rainy season.
Repair and improvement work of minor bridge located at Km 82 of Daboh- Poonch- Gursarai- Tikamgarh road SH-131
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres