Loading…
Loading…
3,417 results • Best match
Construction of RCC Bridge No. 3/1 over river Puthimari at Dolonghat on DeulkuchiGurmow Road with approaches in Baksa District under Rs. 250.00 Crore Additional BTC Package of NLCPR. (Balance Work). Package No. TN_33_1
Design and Construction of seven elevated stations, Foot Over Bridge, Architectural , Finishing, Plumbing and Ground Restoration including Multi-Model Integration works etc. for Lajpat Nagar to Saket-G Block corridor of Delhi MRTS Phase-IV project.
Strengthening work of Bagra to Naya Ghodanal, Parsapani, Mahendrawadi, Churna, Kakri, Bori, Naya Sankai, Naya Kajri, Pathrai road under P.W.D. Sub Dn. Narmadapuram. 2nd Call, PAC Rs. 124.99 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto da
... Rs. 124.99 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment ...
Strengthening work of Raisalpur Ridhodakheda Bamhangaon road, Length 4.33 Km under P.W.D. Sub Dn. Narmadapuram. 4th Call, PAC Rs. 200.62 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
... Rs. 200.62 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment ...
Hyhama Nallah-Construction of flood protection works by way of toe crates on R/S of at Dudwan from RD 2800 to 2824 m and L/S of Hyhama Nallah D/S Regipora bridge RD 3000 to 3325 m.
DNIT FOR CONSTRUCTION OF 180.0 M (04 SPAN 45.0 M EACH) STEEL COMPOSITE GIRDER BRIDGE OVER SATLUJ RIVER AT KM 3/000 ON LINK ROAD CHANDPUR BELA IN DISTRICT ROOPNAGAR (WORK CODE SASN 2026-75)
Construction of Bridge Cum Barrage
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Permanent restoration of road from Noonabandi Bridge to Ziarat Sain Baba Miran Sahib by way of protection Work and other allied works Under Package No.JK11-193 Block NSSB ,District Poonch Length-10.70 kms
Launching/Erection, assembling and transportation of composite girder/open web girder and PSC girder/slab for super structure of major bridges, linking of track on bridge, Supply & fabrication of pathway materials, and other allied works from in ... with construction of ...
B2- Bridge Work
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from Km 69.60 to Km 125.18 involving Earthwork in Formation , Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road ... Under Bridge (RUBs), ... Over Bridge (ROB's), ... Protection Works , ... Track Works with ... Rails) construction of ... SP, Construction of ...
G1A-Execution of Major Bridges & ROBs Foundation works i.e. Piles,