Loading…
Loading…
15,955 results • Best match
Design and Construction of Bridge, Approach Road and Protection work River Kathina in Village Gahiya of Development Block Mitauli in Assembly Constituency Kasta of District Lakhimpur Kheri on EPC Mode.
Design and Construction of Bridge, Approach Road and Protection work River Kathina in Village Gahiya of Development Block Mitauli in Assembly Constituency Kasta of District Lakhimpur Kheri on EPC Mode.
Re-construction work (including bridge construction) of Kumharia more (on Mesra-Pithoriya road) to Sangrampur road (on Karamtoli-Ormanjhi road) (Total length 6.333 KM) for the year 2025-26.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres.Dismantling Brick/ tile work In lime mortar
Repair Work of the railing and painting of the bridge located over tha Behgul river at km 06 on the Faridpur Bisalpur road in Distt Bareilly financial year 2025-26
Mild steel or iron work in heavy sizes such as trusses; builts up gates, door, frames, record racks roof work, gates etc. wrought to required form including drilling holes, rivetting or welding where necessary, and also including supply of steel, bolts, nuts etc. & their fixing required for proper completion of the work. (S.I.No.503)
Repair work on the pre-existing minor bridge and approach road situated over a drain at Km 3 of the link road connecting Nandaur village to Dharoli in District Amethi
eProcurement System Government of Uttar Pradesh Created By: SHAILENDRA KUMAR Created Date/Time: 30-Mar-2026 05:46 PM Tender Title: Repair work on the pre-existing minor bridge and approach road situated over a drain at Km 3 of the link road connecting Nandaur village to Dharoli in District Amethi Tender ID: 2026_CEUFZ_1127127_4
Execution of Earthwork in Diverted Coal handling Road Construction of Road under Bridge RUB No 2 Earthwork in formation Stacking Ground Associated Drainage work and Toe Wall work and Other Ancillary Work