Loading…
Loading…
28,204 results • Best match
Premonsoon work 2026 Under bridges section KozhikodeMaintenance work
... Tender Title: Premonsoon work 2026 Under bridges section KozhikodeMaintenance work Tender ID: 2026_PWD_853611_1
Ordinary repair, Flood damage repair of culverts, Construction of gabion wall and Toe wall, Painting of Bridges etc. at various locations in the AOR of 93 Bn between BP No. 750/13-S to 770/1-S along Indo Banagladesh Border in Jalpaiguri District of ... Civil work
Maintanance and Repair works, safety arrangements at Pune Muncipality footover bridges, subway and station subway as well as various types of works security arrangements for BRT (Part -2)
Maintanance and Repair works, safety arrangements at Pune Muncipality footover bridges, subway and station subway as well as various types of works security arrangements for BRT (Part -3)
Removing obstructions and cleaning of A n g a m a l i - M a n j a l i T h o d u f r o m Choondamthuruth to Oozhamkadavu Bridge in Parakkadavu, Chengamanad and Kunnukara Panchayaths Reach-4
SW-1-Vijayawada Division - Gudur(GDR)-Vijayawada(BZA) Section -Proposed Construction of Road under bridge (RUB) in Lieu of LC No.112 at Rly.Km. 168/16- 18 Between Vedayapalem and Nellore Stations, RUB with RCC Box Size of 1 x 6.0m x 4.80m (Box Air-Pushing Method) and Retaining Wall (on Grand trunk Road side & Mini Bypass). IRPSM ID.11.00.30.13.1.47.021 Year 2013-14
Soil Investigation work for proposed construction of R.C.C Bridges at Madhabpur and Hamarjita over Kudi Khal and K.D.C, G.P.- Barida and Jerthan in Block-Egra-I, P.S.-Egra, Dist-Purba Medinipur
... Specifications for Road & Bridge Works (5th Revision), Published ...
Formation of Bypass to Athur town Km.4/4-7/2 including junction improvements, Construction of Minor Bridges, Cross drainage works and Protective works.
Formation of Bypass to Athur town Km.0/0-4/4 including junction improvements, Construction of Minor Bridges, Cross drainage works and Protective works.
Ordinary Repair, Painting and Other Works of Different Bridges/Culverts under Road Section-1 Dumka under Non Plan Head for the year 2026-27
... Repair, Painting and Other Works of Different Bridges/Culverts under Road Section-1 ...
"Annual repairing/Minor addition and alteration, white/colour washing painting, and misc. Nature of works of WRS-I,II,III,IV,TPT(Rail), WS, WCS-I,II(RM),CBS, BWF, Weigh Bridge and all level crossing, DPS, DCS, TMS, SMS, Load Box shed, Store wards & NSY,MTS,BKS,FS,MS,MCTR,TTS, BFS, BBF, BSS & SS, HTS,CH, GIF, SF, BST (HMRS), TPT (Road), PAT, DSS, CRS, WLD, STC/PTS, BTC, CMT Lab, Elect Offices, Power House & other units, SSY and Compressor House & other units, SSY and Compressor House inside workshop under the control of ATE/JMP of Z-02/26-27".
Repair work on various minor bridges including their approach roads and protective structures along the Durgapur Amethi Musafirkhana Major District Road in the Amethi District
Construction of plant and manifold room with connecting bridges for set up of MGPS connection for new 100 bedded building, Habra SGH - EI work.
PUNE YARD REMODELLING WORKS of - "Construction of minor bridges, retaining wall, circulating area, drain building work, platform, FOB, skywalk, and allied civil works related to Pune yard".
Shifting of HT/LT line regarding upgradation of road work from Chawmanu to Govindabari via 32 Kilo (T21) / Length - 32.164 Km / (Package No-TR-04-05 P2) including 1(one) LS Bridge under Chawmanu Block within the jurisdiction of Chawmanu Electrical Su
WMM & B.T Patch Repair work on Various Roads Under Sub Dn. No. 3 Nava Raipur 1.Gourbhat Bhalera Tamasivni Tandul Road (Km 1 to 17), 2. Chhokra Nala Bridge Approaches at Tandul (Km 1), 3. Jamgaon Mandlor Pond Danganiya Road (Km 7 to 12), 4. Sunderkera Kathiya Nawagaon Road (Km 1/2 to 3/2), 5. Kathiya Tarra Ugetara Nawgaon Road (Km 1 to 5), 6. Ganoud Kharkharahadih Road (Km 1/2 to 3/2), 7. Jounda Mandlore Road (Km 1 to 3), 8. Charoda Khapri Tamasivni Bhurka Pond Road (Km 1/2 to 4/2), 9. Torla Bhurka Kumhari Road (Km 1/2 to 5/8), 10. Tarra 17 Nos. Nali - Nawagaon (Km 1/2 to 3/8-100), 11. Doma Gourbhatti Road (Km 1/2 to 2/4), 12. Kendri to Uparwara Bas Staind (Km 1/2 to 5/2), 13. Jhanki Mudpar Pacheda Road (Km 1/2 to 8/4), 14. Bhelwadih Uparawara Road (Km 1/2 to 2/8), 15. Uparawara Basti IITM College Road (Km 1/2 to 4/2).Under Sub Dn. No. 3 Nava Raipur
SOPD_G_24_25_40 Construction of Road Cum Embankment on Left Bank of Dikrong River (NH 15 at Bahanibari to Sissapathar Bridge Approach)( PART 2 from Ch. 11880.00m to 15140.00m) including approach roads under SOPD G for the year 2024-25
Construction of 4 nos Display sing Board and Repair of 10 nos. Display sign board of various channels and V.R. Bridges of Hansi branch at RD 173290.
Construction of Kongiyakala -Kongiyakhurd to Lolesara Approach Road Length 1.90 K.M. (Working Length 1.10 K.M.) including Bridges & culverts At Distt.- Bemetara (C.G.).
Construction of Chulhapathra to Kariyatola Road Length 3.10 K.M. (Working Length 1.92 km) including Bridges & culverts at Distt.- Balod (C.G.) (CC Road)
Open tender for Jacketing, Repairing & strengthening of arch bridges Br.No.18 in between JMA-BBI, bridges Br.No.32 in between BBI-CCR and Br. No. 14 at Km. 21/17-18 in between JMA-BBI along with other ancillary works under the jurisdiction of DEN/4/Asansol.
1)Improvement of Arch Bridges by extending barrel length and construction of Retaining wall, wing wall and ballast retainer on Bridge no 561/2 DN(span 3 x 5.60m), 577/1 DN(span 2 x 6.10m) , 581/1 DN(span 2 x 6.10m) and 587/2 UP&DN(span 5 x 8.10m) in ... ORN-3 Bridges ( ...
South Central Railway - Construction Organisation : Secunderabad Divison : Secunderabad - Wadi Section : Execution of Earth work in Embankment & Cutting, Blanketing to RDSO standards, Construction of Major bridges, Minor bridges & Road Under Bridges ... (RUBs), Construction of ... Civil works in ...
B-USSR-2021 Items for Bridge works, Drains, Platforms & Pathways 278504147.24 Below/P
OHE modification and other allied work in connection with accomodation of 12 coach MEMU in Anand-Khambat section , rebuilding of bridge in Vadodara- Geratpur section , provision of ballast less track in platform 5 at Anand , converting Bayad station from D class to B class in Nadiad - Modasa section , provision of RUB in lieu of 5 LC in Anand-Khambat section and 07 RUB in Nadiad-Kapadvanj section and extension of platform no.1 at Anand.
OHE modification and other allied work in connection with accomodation of 12 coach MEMU in Anand-Khambat section , rebuilding of bridge in Vadodara- Geratpur section , provision of ballast less track in platform 5 at Anand , converting Bayad station from D class to B class in Nadiad - Modasa section , provision of RUB in lieu of 5 LC in Anand-Khambat section and 07 RUB in Nadiad-Kapadvanj section and extension of platform no.1 at Anand.
Construction of stairs on both side of ROB No.-142, ROB No. 162B, ROB No.178A, ROB No.105C and other Miscellaneous works at other bridges under Sr. DEN/IV/PRYJ.
Surface preparation of steel work of bridge
Construction of Box Culvert at Ch.49.450 km & Humpe Pipe Culvert at Ch. 49.030 km Near Astga Village on S11-240 Highway connecting from Jawalga (J) (on Karnataka/Maharastra Border to Kagina river bridge (on NII 150) via Hudal, Jambga Kotanhipparga, Bharkhed, Tadkal, Munnahalli, Narona, Rikkenalur, Astga, Jambga (B) Kumsi, Bannur, Aurad (B), Tawargera, Harsur,Sathkhed. Tonchi. Kamaknur. New-Hebbal, Bolewad, Wacha, Gundagurthi. Bhagodi, Jeevangi & Shanarwadi, in Kalaburagi Gramin Constituency in Kalaburagi Dist
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Manufacturing and placing of C.C block of size 0.45 m X 0.45 m X 0.30 m in/c allied works at ch 0.400 Km to 0.800 Km
Manufacturing and placing of C.C block of size 0.45 m X 0.45 m X 0.30 m in/c allied works at ch 1.900 Km to 2.300 Km
Manufacturing and placing of C.C block of size 0.45 m X 0.45 m X 0.30 m in/c allied works (Muhuri River) at ch 0.60 Km to 1.00 Km
SCR Construction Organisation - Secunderabad Division: Motumari - Vishnupuram section: Construction of Earth work in embankment & cutting, blanketing to RDSO standards, Construction of Minor bridges, Road Under Bridges (RUBs), Supply & dumping of ... connection works and ... allied works from ...
C-IRUSSOR-2021 ITEMS FOR BRIDGE WORKS - FOUNDATION & SUB-
REPAIRING OF E.M. BYPASS SERVICE ROAD (EASTERN FLANK) ALONGSIDE AMBEDKAR BRIDGE UPTO BASANTI HIGHWAY IN WD NO-66 UNDER BR-VII
... Specifications for Road & Bridge Works of MoRT&H (5th Revision).... schedule of rates 2018(Roads & Bridge Work) , page-249(item- 4.12) ...
Electrical work in connection with Provision of First foot over bridge with cover shed at 5 Station of N.E.Railaway LJN Div, Provision of essential items for Goods shed like Tarpaulin , Major Improvement work like Extension of PF No. 02 & water supply pipeline & sanitation and Provision of RCC OHT, Extension of 09 Nos. Passenger platform at 08 Nos. at different stn. at Ljn-Div, Upgradation of Infrastructure facilities of new coaching depot at GKP, Interlocking of 06 No. LC gates TVU greater than 20000 over LJN DIV, Renovation of CMS hall, waiting room for ladies and gents etc. at crew lobby MLN.
Electrical work in connection with Provision of First foot over bridge with cover shed at 5 Station of N.E.Railaway LJN Div, Provision of essential items for Goods shed like Tarpaulin , Major Improvement work like Extension of PF No. 02 & water supply pipeline & sanitation and Provision of RCC OHT, Extension of 09 Nos. Passenger platform at 08 Nos. at different stn. at Ljn-Div, Upgradation of Infrastructure facilities of new coaching depot at GKP, Interlocking of 06 No. LC gates TVU greater than 20000 over LJN DIV, Renovation of CMS hall, waiting room for ladies and gents etc. at crew lobby MLN.
Construction of Road Over Bridge (1 x 24.0 m + 1 x 42.0 m) Composite Girder for Railway portion in lieu of LC No. KP-09 and proposed span of 8 x 25.04 m RCC Girder on Jatani side and 8 x 25.04 m RCC Girder on Puri side for approach portion, at Railway KM 464/31-33 between stations Motari and Kanas Road on Khurda-Puri line under Khurda Road Division
Routine Maintenance, desilting of waterways, emergency repairs and protection works etc. on Minor/Major bridges between BHRB-SANG section under the jurisdiction of ADEN/Aizawl for two years.
Routine Maintenance, desilting of waterways, emergency repairs and protection works etc. on Minor/Major bridges between JRBM-KGBP section under the jurisdiction of ADEN/Imphal for two years.
Routine Maintenance, desilting of waterways, emergency repairs and protection works etc. on Minor/Major bridges between JRBM-KGBP section under the jurisdiction of ADEN/Imphal for two years.
CD Repair works and road Furniture on various roads Under Sub Division Anuppur (All SOR Item of Road and bridges SOR effected from 11.04.2025 and its Amendment)
Modernization of Bridges and Culverts Falling on link roads in MC Baghapurana District Moga (INCLUDING CONSTRUCTION OF APPROACH ROAD PREMIX WORK AND ROAD FURNITURE ETC.) GROUP NO.17 WORK CODE 26019
DEPOSIT-SP-Maintenance of intake tower -- including water proofing to arrest leakage of intake tower, repairing and plastering of side walls, repairing of hand rails, foot bridges and compound walls-General Civil Work
Construction of major and minor bridges, protection works & other misc. works between proposed Nagda and Ratlam 3rd and 4th Line section in connection with Nagda - Ratlam Quadrupling Project of Ratlam Division - Western Railway.
B-SCHEDULE 'B' (USSOR 2021 items- Bridge and related works) 231254957.00 Below/P
MMPPNA_RIDF_XXXI_25_26_341 Construction of (1) Meteli Ali from Ch 0.00m to Ch 1000.00m (2) Saraipora to Majorbari Road from Ch 0.00m to Ch 1000.00m (3) (Part-A) - Baruah Chuk to Gamon Bridge from Ch 0.00m to Ch 1130.00m, (Part-B) - 0.00m to 80.00m un
Restoration of rain damages Pong Dam Jassur Fatehpur road near Barot SH C o U shape drain at RD 31.800 to 31.900 and providing and laying cement concrete flooring Toe wall and construction of wire crate for protection of bridge at RD 31.750
SCR Construction Organisation - Secunderabad Division: Rail Over Rail (ROR) at Motumari station: Execution of Earth work in embankment & cutting, blanketing to RDSO standards, Construction of Minor bridges, Road Under Bridges (RUBs), Supply & dumping ... Civil works in ... Pre-NI/NI works in ...
C-IRUSSOR-2021 ITEMS FOR BRIDGE WORKS - FOUNDATION & SUB-
Repairing of railing on two bridges in front of Balichak Irrigation Bungalow and construction of road side railing on the south side at Mouza Kanuram under Block P.S. Debra, District Paschim Medinipur
OHE modification and other allied work in connection with replacement of silver brazed contact wire of loop lines in Surat - Geratpur and Vadoddara-Godhra section and in Anand - Godhra section, along with provision of double inclined dropper in ... spare bridge mast ...
Construction of Badekanera Naresh Poyam House To Dongriguda Road From Km 1/2 to 4/6 = Length 3.60 Km Inc Culvert and Bridges Work Code W29754
Earth work in forming embankment, construction of Retaining wall, side drain extension of bridges, Linking of track, etc., in connection with Extension of shunting neck at BG coaching complex/TPJ.
R/R damages on Manpura Dharampur Road Km 0/000 to 7/000(SH Protection work of various Bridges on Manpura Dharampur Road,Crate work,C/o Parapets and repair of railing etc.