Loading…
Loading…
96,824 results • Best match
Renovation and miscellaneous civil works to GM DGM chambers at BSNL Bhawan imphal
Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular ...
GENERAL-CHERUVATHUR FLC RENOVATION OF AUCTION HALL-General Civil Work
10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Special Repairs to office rooms and other repair works in the First floor of Elementary Building at Perasiriyar Anbazhagan Education campus Nungambakkam Chennai 06
Providing Post constructional Anti termite treatment by drilling 1/2" dia holes at uniform intervels of 12" at the junction of the building and the Chemical Chlorophyriphos 20% Equivalent will be walls and floors to a depth of... floors to a depth of 4" to 5" inside or as directed by the departmental officers. The building and the chemical Chlorophyriphos 20% Equivalent will be quirilled inside these hole leg ...
Special repairs to visitor sofa set renewing motor and pipe line antitermite treatment repairs to tensile roof and other repair works to IG Registration building at Santhome High Road Chennai 28
Providing post construction Anti-termite treatment by drilling 1\2" dia holes at uniform intervals of 12" at the junction of walls and floors to depth of 4" to 6" inside the building best quality Anti-termite chemicals emulsion shall be injected into there holes by using ...
Annual Plan Proj No 143 Panchayath office conferrence hall ceiling ceiling works maintenance General Civil Work
GENERAL-Protection works-Right bank of Kuthirapuzha at Kolakkandam Kadavu in Nilambur Municipality of Nilambur LAC, Malappuram DT-General Civil Work
60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.