REPAIR/MAINT OF HIGH MAST LIGHT, SOLAR LIGHT, GATE/ GARDEN LIGHT/ FLOOD LIGHT/ FOUNTAIN LIGHT AND ALLIED WORKS UNDER GE (NORTH) BINNAGURI
M&L UPVC conduit pipe heavy duty 25 mm dia including excavation work for laying cable in conduit complete all as specified and as directed.
Providing and Fixing of LED Light and Decorative Pole from Balicha Tiraha to near Seth Ji ki Kundal Flyover. 2205
P/L of Double wall corrugated HDPE pipe confirming to IS : 16205 P-24, Stiffness Class 750 N, Externally corrugated and having smooth surface inside with HDPE Coupler, Elbow, Tee at required Depth below the ground for laying cable of following Nominal Outer dia. MFR Test report from NABL accrediated is to be submitted.(Excavation of Earth & Back filling with compaction is to be Paid Extra)All as per pre approved by Engineer in charge. For additional technical parameters of products/work, refer Annexure "A" attached with this BSR 50mm Dia
Providing First Floor Roof Sheet for new parking building (MLCP) at Main Market Yard of APMC Byadgi Under Annual Action Scheme 2025-26
Laying of cable in Eisting TrenchGI pipeStone WareRCC Hume pipe using WoodenAluminum Rollers as directed by the departmental staff.2.5 to 25 Sqmm
Provision of CCTV at 20 nos. of Non interlocking LC Gates and monitoring at 12 nos. of connected station and Engineering control over Kota Division
Excavation of trench as per cable route plan, Kilometre 1.2 mtr deep, 300mm wide at the bottom along main line in normal soil, This work includes covering of cable laid in trenches by loose soil for a layer of 50 mm thickness approximately before covering by shahabad stone/bricks, clearing of route, bushes etc and refilling of the trench by excavated soil and ramming after laying of the required quantity of cables as per instructions of Engineer at site. If it is not possible to reach the required depth at any location, then the contractor shall obtain prior approval of Engineer-in- charge before commencement of cable laying process and only then shall the proportionate payment be made to the contractor
As mentioned and described in BOQ
Material and labour for sand cushioning using dry and clean tibba sand in two layers, first layers of 80mm thick before laying of cable and second layer of 150mm thick after laying of cable in trenches/ducts including consolidation of each layers complete all as specified and directed. Note : Punned thickness shall be measured for payment.
Alipurduar Division: S&T Balance work for Utility shifting in connection with development of Stations under Amrit Bharat Station Scheme at GOGH station.
Laying of Power Cable/STP/UTP CAT-6/LS cable through flexible PVC Conduit Pipe/ GI Pipe/HDPE Pipe (where necessary) as per direction of the Rly. Representative, including any fixing of 24 cables/PVC pipe/PVC Casing on wall/shed with suitable clamps (the clamps and screws should be made of Stainless steel). All the fixing materials including Collar, bend, junction etc. shall be supplied by the contractor. This also includes transportation of cable, PVC Pipe, GI Pipe, HDPE Pipe etc. to the site.