2,727 results • Best match
REPAIR/ REPLACEMENT OF PERIMETER/ SECURITY LIGHTS AND ALLIED WORKS AT NORTH ZONE OTM AREA UNDER GE (NORTH) BINNAGURI
M&L providing river sand (washed and screened) cushioning for protection of UG cable (8cm deep before laying & 15cm above the top of cable after laying in trenches with dry sand of approved quality including fillling, spreading and pulling down to desired thickness complete all as specified and as directed. Note: (Punned take of 18cm only shall be considered for payment purpose).
REPAIR/ REPLACEMENT OF STREET/ PERIMETER LIGHTS AND ALLIED WORKS AT SOUTH ZONE OTM AND MD ACCN AREA UNDER GE (NORTH) BINNAGURI
M&L providing river sand (washed and screened) cushioning for protection of UG cable (8cm deep before laying & 15cm above the top of cable after laying in trenches with dry sand of approved quality including fillling, spreading and pulling down to desired thickness complete all as specified and as directed. Note: (Punned take of 18cm only shall be considered for payment purpose).
Construction of Residential Portion in New District Jail Fatehabad (1 No. Superintendent Jail Residence, 6 Nos 1900 Sqft Houses, 24 Nos 800 Sqft Houses, 72 Houses 650 Sqft Houses, 12 Nos 550 Sqft Houses, Warder Hostel and 9 feet height Boundary wall)
[24.2.2.2]LT CABLE 2.2. Laying of underground cable 0.75 metre below ground level covered with sand and bricks including excavation and refilling of trenches.:- 16 Sq mm to 35 sqmm 2 to 4 Core [Through Rate]
Signaling estimate in connection with fencing work in KALYAN-IGATPURI of Mumbai Division
Excavation of cable trench as per cable route plan, 1.0 mt. deep and 300mm wide along side the track in normal soil/strata, conforming to distances as per cable route plan and 18 refilling after cable laying. This work includes covering of cable laid to trench by loose soil for a layer of 50mm thickness after clearing of route, bushes etc. It shall be ensured that top of the cables laid is at a depth of 0.8 m or more. If it is less, then the width and depth shall be suitably increased and accordingly proportionate payment shall be made. In case depth of trench is not achievable due to site conditions, proportionate payment will be made as per procedure. The work shall be done as per extant practice on C.Rly & the instruction of Railway engineer at site. Drg No SK 805 Above/
ADDN ALTN TO BLDG. No. P 79 FOR SETTING UP OF ROH FACILITY FOR ROTAX SERIES ENGINE AT 8 BRD
Material & Labour for Sand cushioning to underground cable 8cm before laying the cable and 15cm (punned down to 18 cm) after laying and stretching the cable complete all as specified.
SPL REPAIR TO BUILDING NO P-48(ROOF TREATMENT) AND OTHER MISC REPAIR AT MENDHAR UNDER GE 881 EWS
Material and labour for river sand as in sand cushioning to under ground cable 8 cms thick before laying the cable and 15 cms thick after laying & streching the cable in trenches, including hand punning and consolidating complete all as specified and directed. Note : For payment purpose punned thickness 18cm shall be measured.