Loading…
Loading…
2,650 results • Best match
LIGHT/2026-27/2614-19 DATED 11.06.2026 S.NO. 01
P / L of Double wall corrugated HDPE pipe confirming to IS : 16205 P-24, Stiffness Class 750 N, Externally corrugated and having smooth surface inside with HDPE Coupler, Elbow, Tee at required Depth below the ground for laying cable of following Nominal Outer dia. MFR Test report from NABL accrediated is to be submitted.(Excavation of Earth & Back filling with compaction is to be Paid Extra)All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR. 63 mm
Signalling work in connection with Extension of shunting neck and converted into DN Goods loop line at Tilati station of Solapur Division.
400.00 route plan, 1.0 mt. deep and 300mm wide along side the track in normal soil/strata, conforming to distances as per cable route plan and refilling after cable laying. This work includes covering of cable laid to trench by loose soil for a layer of 50mm thickness after clearing of route, bushes etc. It shall be ensured that top of the cables laid is at a depth of 0.8 m or more. If it is less, then the width and depth shall be suitably increased and accordingly proportionate payment shall be made. In case depth of trench is not achievable due to site conditions, proportionate payment will be made as per procedure. The work shall be done as per extant practice on C.Rly & the instruction of Railway engineer at site. Drg No SK 805
Augmentation of sub-station of Dholpur station of Agra Division.
Excavation of cable trench:- This item shall be operated in conformity with IS:1255 (latest version) i.e. code of practice for installation and maintenance of HT/LT cables. The price shall cover cost of excavation of cable trench in all type of soil for laying LT cables and back filling the same with sieved earth and finishing the surface in its original condition after providing sand, & bricks in cross position. For LT/HT cables the trench shall be 600mm wide x 1000mm deep. In trench 29 the cable shall be covered with river sand at a depth of 100mm below the cable and 100mm above the cable than placing well-burned bricks continuously in crossposition through out the cable route in the ground. The bottom of the trench should level free from stones and sharp edge of rocks etc. At the termination a loop of 5 meter (approx) cable shall be kept as allowance and loops rings be formed as per the site condition, in the ground, The cost shall include the cost of all materials i.e. sand, bricks, cable route markers (grouted in the earth firmly with cement concrete so that it can not be uprooted by miscreants) etc at 25m. interval and each turn of the cable.
S&T works in c/w (A) Prayagraj Division-Provision of stabling lines at Subedarganj station. (B) Construction of a new island platform at Subedarganj (SFG) by dismantling at line No. 2 & 3 along with retaining of existing PF No. 6.
"Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes etc. 27 as per the site requirement and as per approved cable route plan. This also includes laying of cables in track crossings & road crossings.(Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. Inspection by-Consignee"
as per tender documents
Laying of HDPE Pipe PE-80, PN-6, DN-160mm dia Pipe for laying of 33KV, 3x300Sq.mm, XLPE Cable with HDD (trenchless) method including cable laying.
A)Butibori-Augmentation of SSE(T)/Butibori store depot due to commissioning of 3rd and 4th line under the jurisdiction of ADEN South. B)Sewagram-Augmentation of SSE(T)/Sewagram store depot due to commissioning of 3rd and 4th line under the jurisdiction of ADEN South.
laying cable) to bring the original condition.