Loading…
Loading…
2,703 results • Best match
Extension of 3 Nos of TRMTD Line and 1 No of Filtrate Line and Construction of 20 M Wide Corridor at Damonjodi, Odisha, India
SUPPLY OF ELECTRICAL ITEMS : GI Pipes/Hume Pipes (Heavy Duty) for laying of cables below Roads/Drain crossing, Railway Tracks etc. 100mm dia for Road crossing/Rail track crossing
REPAIR TO SHED FOOTPATH PLINTH PROTECTION AND CERTAIN B/R WORKS AT ADM REGT AD STATIC APS AAD COLLEGE MH IN ZONE A AREA AND REPAIR/REPLACEMENT OF HT SWITCH GEARS AND MAINTENANCE OF DISTRIBUTION TRANSFORMER ZONE B ALONGWITH ALLIED WORKS UNDER GE(I)GOS
Excavating in trenches not exceeding 1.5 meter wide and not exceeding 1.5 meter in depth for foundation for erection of poles, stays, laying cables, stays etc and getting out in soft/ loose soil all as specified and directed.
S&T works in connection with elimination of LC 3 & 59 in Rewari yard with construction of ROB and RUB at same location in Jaipur Division.
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item 30 includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on each cable to give the cable number at each Gantry Post/hectometer post. (Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution
Providing SOP to LIS to Gram Panchyat Tihra, Kot, Greyoh, Cholthara, Sadhot, Sajao piplu, Darwar under JSV SDTihra under PMKSY(har khet ko pani) from 11KV S/Stn. Tanihar under ESD Tihra under ED Dharampur. (33KV HTline from 33/11KV 1X3.15MVA S/Stn.
1 Excavation and refilling of Trench [as per HPPWD HPSR], Laying of Cable,Laying of RCC Cable Cover and route indicator etc,Heat Shrinkable Cable Jointing/termination Earthing & Fixing of warning tape 1.01 P/km 106,866.10 106866.10 19235.90 126,102.00 127363.02 1079.35 128442.37 127170.66 128442.37 CD-203
Augmentation & Upgradation by AB Cable installation to stop pilferage of electricity at Rest Camp, Replacement of ACSR by MVCC Cable for 11 KV HT Feeder, rest camp feeder, Augmentation of Water supply & upgradation of substation under SSE/P/PNO, NGC, KYQ & GHY.
Laying, commissioning of LT/HT cable XLPE insulated power cables with armoured aluminum conductors of different sizes including routing partly on poles and partly in underground cable trench as per site requirement. The work shall include proper handling of cables such as loading, unloading, transportation, carrying to actual work site, dressing, clamping on poles, laying 3 in trench with required depth, sand cushioning, protective brick/RCC covering, cable identification tags, bending radius compliance, termination and jointing (if any), and end sealing. The scope also includes all labour, tools & tackles, consumables, protective works, and incidental items required for complete execution. Cable laying shall be carried out ensuring proper alignment, mechanical protection, earthing continuity of armouring, and compliance with relevant IS/IEC standards and Railway specifications. Testing and commissioning shall include insulation resistance test, continuity test, and high voltage test (where applicable) before energisation.
PROVN OF SECURITY LIGHTS AND CONNECTED PLACES AT CERTAIN LOCATIONS AND SPECIAL REPAIR TO LT FEEDER PANEL ALONG WITH ASSOCIATED WORKS AT AF STN ISSAPUR C/O 25 WG UNDER GE (AF) GURGAON
M & L for dry sand cushioning to underground cables with 8cm thick before laying of cables and 15cm thick after laying ( total 23 cm ) and compaction till 18 cm thick for measurement purpose complete all as specified and directed .