Loading…
Loading…
2,682 results • Best match
PROVN OF BOUNDRY WALL BETWEEN POST NO 1 TO POST NO 2 IN HRDC HQ NORTHERN COMMAND AND OTHER PROVISIONS WORKS UNDER GE SOUTH UDHAMPUR
M&L for sand cushioning with dry local sand for cable protecting under ground cable (8 cm before laying the cable and 15 cm after laying the cable) in trenches including punning the sand upto 18 cm thick and consolidated complete all as specified and directed.
REPAIR AND MAINT OF HIGH MAST LIGHT AND FLOOD LIGHTS AND CONNECTED ITEMS UNDER GE (AF) TECH AREA AGRA
Excavation in trenches in soft/ loose soil n.exc 1.5m wide and n. exc 1.5m depth for laying of cable, errection of poles, stay and pipe line,and getting out complete all as specified and directed.
Providing Water supply Arrangements Electrical Works EB Service Charges construction of RCC Compound Wall and RCC Culverts at Anaipalayam Burial Ground in Ward No 25
Supply,Erection and Laying of Cable Gland suitable for 3 1/2 core 185 sq.mm. UG Cable
REPAIR/MAINT OF UG CABLE, EARTHING,FEEDER PILLAR BOXES, LT PANEL AND STREET LIGHT AND GARDEN LIGHT SYSTEM AT HQ SNC SANJIVANI, ELLISION AVENUE, NSRY, SNC(O) MESS, NIAT, ASW, COMCEN, SIGNAL SCHOOL AND OTHER AREAS AT NAVAL BASE KOCHI.
Excavation in trenches soft/loose soil not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth and getting out excavated soil/sand/unseviceable LT Cable for laying of cable complete all as specified and directed.
PROVN OF ADM BLOCK FOR HQ CWE AND GE(W) IN JABALPUR MIL STATION
Item No 07 : Supply, laying & testing cable XLPE insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty)with stranded aluminium conductor, 1100 volts grade, of size 35 SQ mm, 3.5 core complete all as specified and directed.
REPAIR/MAINTENANCE OF FIRE ALARM FIRE FIGHTING SYSTEM, EOT CRANES AND HANGER DOORS AT VARIOUS LOCATIONS AT AF STATION CHANDIGARH UNDER GE (AF) CHANDIGARH
Excavation in trenches in any type of soil n. exc. 1.5m deep and n. exc. 1.5m in width and getting out including forming bottom surface to required slope/ gradient for laying cables/ pipes etc. complete all as specified and directed. Notes: (i) Excavation shall be done carefully to avoid damage of existing cables and protection covers. (ii) Excavation work may be got carried out in short lengths for locating fault in underground cables at different locations.