Loading…
Loading…
2,683 results • Best match
Design, Supply, Installation, Testing and Commissioning of 10 Passengers Lift along with steel structure and ACP Cladding for suitable Lift
Laying of cable in existing trench / GI pipe /stoneware/RCC Hume pipe/using wooden/aluminium rollers as directed by the departmental staff.LT Cable. 35 to 95 SQmm ---- With all lead and lift including...
Formation of residential layout in Gumachanamardi village in RS no 224/1 in Hukkeri Taluka under Budha Basav Ambedker Niveshan yojane.Under H/A 4059-60-051-0-05-422-SCP for the Year 2025-26
18 Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable Km 0.02 20886.00 417.72 0.00 0.00 0.02 0.02 20886.00 0.00 0.00 417.72 417.72 417.72 0.00 417.72
S&T works in c/w compliance of RDSO TAN for Automatic Fire detection and alarm system and earthing and bonding arrangement over Jodhpur Division.
6000.00 pairs/ quads in trenches/ GI pipes/ RCC Metre pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on each cable to give the cable number at each Gantry Post/hectometer post. (Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution
REPAIRS REPLACEMENT OF LT PANEL MCCBs AND CONNECTED ITEMS AT WELLINGTON STATION UNDER GE WELLINGTON
Cutting PCC/ Road 200 mm thick for laying of cable all as specified and directed
REPAIR / MAINT OF HT PANELS/VCBs, HT CABLES, TRANSFORMERS, RMUs/EARTHING AND CONNECTED WORKS AT HQTC BANAGALORE
Material and labour for sand cushioning to under ground cable with locally available dry sand for protection of cable 8cm thick before laying of cable and 15 cm thick after laying and stretching the cable below the bricks/PCC cover ,punning of sand using suitable T&P as per site requirement complete all as specified and directed Note- Punned thickness of sand i.e 18 cm to be consider for measurement purpose.
PROVN OF BOUNDRY WALL BETWEEN POST NO 1 TO POST NO 2 IN HRDC HQ NORTHERN COMMAND AND OTHER PROVISIONS WORKS UNDER GE SOUTH UDHAMPUR
M&L for sand cushioning with dry local sand for cable protecting under ground cable (8 cm before laying the cable and 15 cm after laying the cable) in trenches including punning the sand upto 18 cm thick and consolidated complete all as specified and directed.