Loading…
Loading…
2,860 results • Best match
Laying of 1.1KV LT Cables of various sizes in D/S Division
Laying of one nember PVC insulated and PVC sheathed / XLPE power cable of 1.1KV grade of size 400 Sq.mm/3.5C direct in ground including excavation, sand cushioning, protective covering and refilling the trench as per specifications, in Soft soil
Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40KL capacities & staging 12. mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including ... Providing, laying , ... /Nylonwireropeandconnection cable including ...
Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40KL capacities & staging 12. mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including ... Providing, laying , ... /Nylonwireropeandconnection cable including ...
Supply and Installation of LT panel at Ozone Switchgear, relocation of power supply distribution panel and laying of power supply cables to office, colony, canteen, pump house at YCCP Plant, Yelahanka
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as per the direction of Engineer-in-charge- (0.210 km x 2 runs = 0.42km) - LT Cable - 120 to 240 Sqmm
Custom Bid for Services - Laying AND Termination of XLPE AND PVC Power cables Similar Category Electric Cabling Service Operation and Maintenance Of Electrical Systems/Electrical Installations
Custom Bid for Services - Laying AND Termination of XLPE AND PVC Power cables Similar Category Electric Cabling Service Operation and Maintenance Of Electrical Systems/Electrical Installations
Enhancing safety by replacing defective/ worn-out TLJBs, Track leads, point insulations, ground connections, Location boxes & foundations, Signal assemblies & foundations including trenching, laying of cables, terminations etc in the section of ADSTE/ BAZ on Kota Division.
Excavation of cable trench 1.0m deep from Metre the rail flange and 300mm wide across the track, for track crossing and refilling after laying of RCC/ GI/ DWC pipes and restoring the track to its original condition. Generally there shall be no proportionate payment for cable at depth lesser than that specified in the tender schedule. If it is not possible to reach the required depth at any location, then the contractor shall obtain approval of Railway Site Engineer, who shall get the dispensation, from JAG vide Rly. Board's letter No. 2013/Sig/SEM Pt.-II/Misc., dated 12.06.2014 before commencement of cable laying process and only then shall the proportionate payment be made to the contractor. The work shall be done as per extant practice on W.C. Railway & instruction of Railway Engineer at site. Cable trench as per Drg. No. TS/Cable laying/12/03/03 Alt.-1. For achieving 1.0 Mtr depth for the bottom most cable, the contractor shall dig the trenches to a depth, slightly more than 1.0m to take care of practical problems. Laying of RCC/GI/DWC pipe and cables is covered in separate item.