Loading…
Loading…
2,765 results • Best match
ADDN/ ALTN TO JCOs/OR MD ACCN AT BHATTACHARJEE ENCLAVE UNDER AGE B/R-II OF GE (N) MAMUN
M&L for sand filling in trenches as cushion to under ground cables 8 cm thick before laying the cable and 15 cm thick when cables are laid and tested complete all as specified and directed. Note: Only punned thickness i.e 18cm shall be measured and paid.
ADDITION ALTERATION AND SPECIAL REPAIR TO MI ROOM (P-92) AND PROVN OF SAFETY LIGHTS FROM P 135 TO OFFICER MD ACCN AREA TILL MAHUL HOUSE AT TS MAHUL UNDER GE (NW) MANKHURD.
Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth and not exceeding 10 sqm on plan and getting out in soft/loose soil for laying of cables, ERW pipes etc. complete all as specified and as directed.
ADEN/MYA Sub-division : JnanaBharathi - Halt (GNB - H) Stn : Proposed Extension of PF-1 and PF-2 for a length of 95.00 mts with 5 mtr width, Construction of 1 No's of Pay and use Toilet along with Divyanjan Toilet, Drinking water Booths, Platform Shelter at Jnanabharathi-H(GNB-H) station between Bengaluru - Yeliyur section, under ADEN/MYA jurisdiction. Maintenance period is 6 months or one monsoon period whichever is later.
Laying of LTUG cable 4 c043 25samm Metre ncluding termination of cable at both [Ref LOA No: 10811020101567]
Construction of New Building of Sub Centres and Group Centres under intensive Cattle Development Programme at Padardi, Dist- Sabarkantha
for laying cable or locating the fault all over the run and
Control room building extension of (02 Span) with electrification, Renovation of existing building,Yard PCC, Metal Spreading, GP2 Grouting, RCC Road & other misc civil works at 66KV Narali S/S, under Dhrangadhra AM Division of Surendranagar Circle.
EIC. Item Includes the cable laying up to termination box with
Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Gandigwad in Khanapur Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
a) RCC Cable duct for laying of control cables with cable tray.(Duct size:1 mtr WidthX 1 mtr DepthX 26 Mtr Length including 33 KV and 11 KV side) Mtrs 26.00 6388 166075.00