Loading…
Loading…
2,774 results • Best match
Providing Water Proofing, Painting, Fly-Mesh, Door Repairs, Electrical & Other Repair Works
Laying of cable in Existing trench /GI pipe/Stone ware/RCC Hume pipe using wooden / Aluminium Rollers as directed by the departmental staff. LT cable 2.5 to 25 sq mm ---- With all lead and lift includ...
Contruction of transfer station at Denkin Bhavi at Tarfile in Kalaburagi city (Fund-SBM 2.0 & ULB share) (Estimate cost Rs. 77.80 lakhs) (category- others)
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff 2.5 to 25 Sqmm (ESCOM SR 2023-24 I.No 21.05)
Special Repair work for FSL Building, Construction of Room For Hydrogen/Nitrogen Bottle, Ground Leveling & IPS Work of Open Ground at Front side of FSL Building, Construction of Sump and Pump Room & Providing, Installing, Testing and Commissioning Fire Fighting System For FSL Building at Junagadh. Dist:Junagadh. (Including Electric work)
170A Supplying and laying UPVC cable trunking system 30.00 Mtr. 275.00 Rupees Two Hundred
Electrical work for Construction of Seven storied building for Institute of Neuroscience with seven storied foundation, two storied Electrical Sub-station building three storied foundation Canteen building within compound of--- External EI Work.
Laying of cable of 1.1 KV grade following sizes on existing cable tray/L- channel angle and binding with suitable size GI wire/or D-clamp incl. with earthing attachment in 2 x 10 SWG GI (Hot Dip) Wire, as mentioned below as to GS:-
SPL OF BLDG NO P-2/5/5 (OFFICER COMPLEX) OF DEF and EMP COY, HQ 20 MTN DIV UNDER GE (NORTH) BINNAGURI
M&L providing sand cushioning for protection of UG cable (8 cm deep before laying & 15 cm above the top edge of cable after laying) in trenches with dry (coarse) sand approved quality including filling, spreading and punning down to desired thickness complete all as specified & as directed. (NOTE : Punned thickness of 18 cm only shall be considered for payment purpose)
Impvt. of Gopapur Sasanga Road from Ch. 0.00 km to 5.764 km under Baramba Block in the Dist. of Cuttack for the Year 2025-26.
Erection, Commissioning & Testing of 11kV new line by 3Core, 400sqmm, XLPE UG cable Laying, Commissioning & Testing of 11kV, 3Core, 400sqmm, XLPE insulation (extruted type) UG cable by open trench method.