Loading…
Loading…
2,773 results • Best match
CONSTRUCTION OF COMMUNITY Hall AT T. P. S. No. 5 (City Wall Improvement) (Section - 7) Final Sanc., F. P. No. 26 Ahmedabad, near dariyapur Darwaja central zone.
laying cable or locating the fault all over the run and back
CA NO GE (W)/HSR-12/2026-27 SPL REPAIR IN BLDG NO T-198 AND ADDN/ALTN OF BLDG NO T-395 (OFFR MESS) AND PROVN OF SEWAGE LINE AND DRAINS UNDER GE (W) HISAR AT HISAR MIL STN
Excavating in trenches, n. exc 1.5 m wide and n exc 1.5 m in depth for taking out unserviceable of LT under ground/laying cable complete all as specified and directed.
SPL REPAIR TO BLDG NO. P-208 AND P-209 (OR LIVING) OF CERTAIN UNIT AND BLDG NO. P-153 AND P-154 (O8 Dus) JCOs MD ACCN OF CERTAIN UNIT AND OR MD ACCN BLDG NO. P-150 AT ARMY AREA BANAR UNDER GE BANAR
M&L for cutting the road/hard standings/boundary wall and excavating in trenches not exceding 0.45 mtr wide and not exc 0.60 mtr deep across the road for laying cable including making good the excavated portion by means of PCC 1:2:4, Type B1 using 20 mm graded stone aggregate complete and matching with the surroundings complete all as specified and directed by Engr-in-charges.
Development of Ghat at Shivpuri (Rishikesh) Dehradun, Uttarakhand
LT CABLE LAYING
Development of Gati Shakti Cargo Terminal (GCT) at New Dabla station
17 MR 17 Horizontal Direction Drilling (HDD)/ Boring and trenchless cabling, supply, transportation and insertion of self lubricated HDPE pipe and laying of cable in boring under the track/Road/ground/masonry building by using self lubricated HDPE pipe of 120 MM outer dia and 103.5 mm inner dia in the bore and the laying of cables in the bore under the track/Road/ground/ masonry building. The depth of horizontal boring should be minimum 1m from rail flange/Road Level/ ground as per site requirement. 100 Meter 849.08
Construction of new VIP Guest House in the premises of the existing Public Works Department Government Guest House at Oorigaum in K.G.F. Assembly Constituency, K.G.F. Taluk, Kolar District
Labour charges for Laying of XLPE UG Cable Using Conventional Laying with Excavation of Soil (Page : 365)