Loading…
Loading…
2,780 results • Best match
CWE/CHM-14/2026-27 CONSTRUCTION OF RETAINING WALL AT SHRI NAGESH OFFICERS MESS AT CHANDIMANDIR MIL STATION UNDER GE CHANDIMANDIR (PARA 35 WORK)
Excavating in trenches in any type of soil not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth, for foundation, or for shafts, wells, cess pits, manholes,poles, pier holes, laying of pipe/ cable etc., not exceeding 10 sqm on plan and getting out complete all as specified and as directed by Engineer-in-Charge.
CA NO CWE/AMB/UTILITY-33 OF 2026-27 SPECIAL REPAIR OF CENTRALIZED AC AT RAINA AUDITORIUM UNDER GE (UTILITY) AMBALA CANTT
Supply and laying connecting and testing XPLE underground cable insulated and overall sheathered with aluminium conductor heavy duty 1100 volts grade 120 sqmm 3.5 core laid in trenchers/on pole/road crossing or passing through existing/new pipe under road crossing clamping on wall etc, complete all as specified and as directed.
Provision of Railnet facility at Barhni,Balrampur stations for SSE/Works & SSE/P Way offices in the LJN Division.
Horizontal direction drilling (HDD)/Trenchless digging/machine drilling without damage to surface road /track for laying/insertion of DWC/GI/HDPE pipe. The bore shall be done of 12 min. diameter 120mm & at the depth of minimum 1400 mm from the ground level.The ground level shall be consideredignoring the bank height of the bank of the road/ track. Note:- DWC/HDPE/GI Pipe supply is not covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cables shall be laid cautiously so that these should not get damage due to rough handling & pressure on cable. Payment of boring shall be madeonly after laying of DWC/HDPE/GI pipein the bore. Inspection- Consignee Above/
Telecom Facilities for new class room ,model room ,principal office mess at MDDTI of Kota Division WCR
All work pertaining to HorizontalDirctional Metre Drilling (HDD)/Boring andtrenchless cabling. It includessupply, transportation and insertionof self lubricated HDPE Pipe andlaying of cables in boring under thetrack/road/platform/circulating areaby using different sizes of pipesdepending on total number of cableswill be crossed. The depth ofhorizontal boring should be minimum1 mtr upto 3 mtr, from rail flange/road level/ground level as per siterequirement and as per instructionsof Railway Engineer incharge. Thisitem will be used for track crossingof running lines, road crossing &circulating area. By using selflubricated HDPE Pipe of 110mmouter dia and 103.5mm inner dia inthe bore and laying of cables in thebore under the track/road/circulatingarea KOTA DIVISION-SIGNALLING AND TELECOMMUNICATION/WEST CENTRAL
REPAIR REPLACEMENT OF HT UG CABLE GT VCB RMU TRANSFORMER AND ITS CONNECTED ITEMS OF SALARIA OFFICERS ENCLAVE UNDER GE WEST DELHI CANTT
M&L for excavation in trenches in soft soil n.exc 1.5 Mtr wide and n.exc 1.5 meter in depth for laying of cables/pole etc setting out trimming the site forming bottom surface to required level complete all as specified and directed.
Extension of HT Supply to M/s. DEPOT MANAGER, TGSRTC, MEHDIPTNAM BUS DEPOT, MCH No.12-2-826/A/49, 43/4 and 826, Mehdipatnam, Hyderabad for a CMD of 6000 KVA with a connected load of 4500 KW under HT Category-IX at 33 KV side duly proposing separate dedicated 33 KV feeder from 132/33 KV Asif Nagar EHT Sub-Station in Mehdipatnam Sub-Division of Mehdipatnam Division of Central Circle under Capital Works under SC Category.
Lay-2nd Cable in Excavated Trench