Loading…
Loading…
2,784 results • Best match
SPECIAL REPAIR OF LT PANELS, INTERNAL WIRING, FITTING, LIGHTING AND ALLIED E/M WORKS GROUND FLOOR OF SR WG OF BLDG NO P-644 (ARMY PUBLIC SCHOOL) UNDER GE (I) GOS
Excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying of cables, pipe lines, protection pipes and foundations etc and getting out in soft loose soil complete all as specified and directed.
REPAIR MAINT OF WATER SUPPLY NETWORK ATTENDING BREAKDOWN DAY TO DAY COMPLAINT OF WATER SUPPLY PIPE LINE REPAIRS TO PUMP MOTOR SETS AND CONNECTED MISC WORKS OF NAVAL BASE AND ADJACENT AREAS WITH CERTAIN WATER SUPPLY WORKS UNDER GE (U-II)( V)
Excavation in trenches not exceeding 1.5 m wide and not exc. 1.5 m depth and getting out soft / loose soil for laying of cables, pipes etc, complete all as specified and directed by Engr-in- Charge.
REPAIR/MAINTENANCE OF MAIN DISTRIBUTION BOARDS, SERVICE CONNECTIONS, SUBMAIN WIRING, BLDG SECURITY LIGHTS, BLDG EARTHING AND CONNECTED WORKS UNDER GE (EAST) MATHURA
Excavation in trenches in soft/loose soil not exceeding 1.5 mtr in depth and not exceeding 1.5 mtr wide for laying of cables and getting out all as specified and as directed by Engr-In-Charge.
SPL REPAIR TO MD ACCN BLDG NO P-150/09 TO 150/16 OF FD HOSP AT MIL STN ALWAR
Excavating in trenches not exc 1.5 metre wide and not exc 1.5 metre in depth for foundation or for shafts, walls, manholes, laying of cables, pipes etc not exc 10 Sqm on plan and getting out in soft/loose soil complete all as specified & directed.
CA NO. GE AF NO.1 / GUR-58 / 2026-27 DAY TO DAY MAINTENANCE OF ELECTRICAL SUBSTATIONS, ELECTRICAL FITTINGS OF E/M INSTALLATIONS AND MISC AREAS AND COMPREHENSIVE MAINTENANCE OF E/M INSTALLATIONS WITH CONNECTED ITEMS AT 54 ASP AF STATION GURGAON UNDER
(viii) The Electrician and helper will be interviewed by JE E/M /Engr-in-charge for verification of experience, character and sound mind and body. (ix) Cost of materials for laying of cables, stretching of OH conductor, burnt out joints, fuse wires, insulator and jumper will be measured and paid separately under relevant items as Material & Labour. (x) The contractor will have to provide additional resources as per the direction of Engr-in-Charge for speedy disposal of complaints as and when required. If any manpower is absent penal charge @ Rs 1000/- per person will be levied to the contractor. Penal recovery @ Rs 500/- per complaint per hour will be levied from the contractor in case of late attending of complaint after reasonable time or 2 hours whichever is more as decided by Engr-in-Chage / GE (xi) The scope of work cover all complaints received from above concern power houses will be lodged/docketed/attended/completed. The completion will be rendered on complaint register as well as on docket.
8248/E8
Excavation in trenches Hard/Dense, not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, valve pits, wells, cesspits, manholes, pier holes,laying of cables/pipes etc. not exceeding 10 sq m on plan and not exceeding 1.5 m in depth and getting out in Soft/disintegrated soil complete all as specified and directed.