Loading…
Loading…
2,784 results • Best match
Augmentation and Upgradation of 66 11 KV Grid Substation at PGIMER, Chandigarh.
Excavation for cable trench in soft soil, dept upto 1.2M including dressing of side lift upto 1.5M, Including getting out the excavation soil, rifilling with sand and or good soil after laying of cables/pipes etc. in layers of 20cm, ramming, watering and disposal of surplus of excavated soil as directed with in lead of 50 meter.
REP OR REPLACEMENT OF SEWAGE SYSTEM BY CLEANING OF SEWAGE LINES MANHOLES GULLY TRAP AND SEPTIC TANK ETC AT NP LINE GNC LINE VNC AND VOC AREA UNDER AGE BR-II OF GE (CENTRAL) BANGALORE
Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of cables , stay etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in soft/loose soil complete all as specified and directed.
REP AND REPLACEMENT OF SEWAGE SYSTEM BY CLEANING SEWAGE LINES MANHOLES GULLY TRAP AND SEPTIC TANK AT OTM ACCN OF ASC CENTRE (SOUTH) UNDER GE (CENTRAL) BANGALORE
Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of cables , stay etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in soft/loose soil complete all as specified and directed.
SPECIAL REAPIR FOR REPACEMENT OF BER CHS, SPACE HEATER ALONGWITH CONNECTED WORK AT AF STN LEH
Excavation in trenches in hard/dense soil not exceeding 1.5 meter wide and not exceeding 1.5M in depth for laying of cables and getting out of excavated material complete all as specified and directed by Engineer-in-Charge.
Provision of CCTV surveillance system at Relay Huts, Relay Room & SM Room for EI and IBS station over Lucknow Division, Northern Railway
Horizontal direction drilling(HDD)/Trenchlessdigging/machine drilling withoutdamage to surface road /trackfor laying/insertion ofHDPE/GI/DWC pipe. The boreshall be done at the depth ofminimum 1400 mm from theground level. The ground levelshall be considered ignoring thebank 26 height of the bank of the road. Note:- DWC/HDPE/GI PipeSupply is not covered under thisitem. Contactor shall provide allmaterial required for work andadequate nos. of labours forproper laying of cables into thebore. Cable shall be laidcautiously so that it should notget damage due to roughhandling & pressure on cable.Payment of boring shall bemade only aft er DWC/HDPE/GIpipe is laid in the bore."
SPECIAL REPAIR OF BLDG NO P-96 AT TRANSIT CAMP UNDER GE NAGROTA
Excavation in trenches in any type of soil not exc 1.5 mtr in depth and 1.5 mtr wide and getting out for laying of cables.